BlueSafe

Trenching and Drainage Excavation SWMS

This SWMS covers planning, excavating and reinstating trenches and drainage excavations, including support, access, bedding, pipework and backfilling.

Activities covered include

  • Plan the work and review the SWMS
  • Install trench support systems
  • Reinstate the area and demobilise

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Trenching and Drainage Excavation SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers planning, excavating and reinstating trenches and drainage excavations, including support, access, bedding, pipework and backfilling. It supports identifying ground, service, plant and excavation hazards before and during the work.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan the work and review the SWMS
  • Locate and isolate underground services
  • Set up and control the excavation work zone
  • Inspect plant and equipment before use
  • Position plant and manage spoil near the excavation
  • Excavate trenches and ditches
  • Install trench support systems
  • Inspect the trench and provide safe access
  • Prepare bedding and pipework
  • Connect drainage components
  • Backfill and compact the excavation
  • Reinstate the area and demobilise

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out trenching and drainage excavation activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan work and review SWMS
  • Unplanned excavation
  • Incorrect work method
  • Worker unfamiliarity
  • Weather exposure
  • Fatigue
Locate and isolate services
  • Underground services strike
  • Electric shock
  • Gas release
  • Water inundation
  • Telecommunications damage
Set up work zone
  • Unauthorised entry
  • Vehicle strike
  • Fall into trench
  • Public exposure
  • Plant-pedestrian interaction
Inspect plant and equipment
  • Plant malfunction
  • Hydraulic hose failure
  • Uncontrolled movement
  • Flying debris
  • Noise exposure
Position plant and manage spoil
  • Plant roll-over
  • Edge collapse
  • Crush from slewing plant
  • Falling spoil
  • Overhead services
Excavate trench and ditch
  • Trench collapse
  • Plant strike
  • Falling material
  • Service strike
  • Dust and silica
  • Water ingress
Install trench support
  • Ground collapse
  • Crush during shield placement
  • Suspended load
  • Failure of shoring
  • Engulfment
Inspect trench and provide access
  • Trench collapse
  • Fall into excavation
  • Unsafe ladder access
  • Hazardous atmosphere
  • Water accumulation
Prepare bedding and pipework
  • Manual handling strain
  • Crush from pipe movement
  • Trench collapse
  • Silica dust
  • Cuts from pipe edges
Connect drainage components
  • Crush injury
  • Solvent exposure
  • Pipe instability
  • Confined workspace
  • Hand-tool injuries
Place backfill and compact
  • Worker struck by plant
  • Trench collapse
  • Dust exposure
  • Compactor vibration
  • Damage to pipework
Reinstate and demobilise
  • Residual open excavation
  • Plant strike
  • Trips and slips
  • Unsecured services
  • Environmental contamination

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Model WHS Regulations, rr 291 and 299-302: high risk construction work and SWMS requirements.
  • Model WHS Regulations, rr 304-306: underground essential services, excavation risk management, access control and trench-collapse controls.
  • Safe Work Australia, Excavation Work Code of Practice: trench support, inspection, water management, access and mobile plant controls.
  • Safe Work Australia, Managing the Risks of Plant in the Workplace Code of Practice.
  • AS 1742.3: Manual of uniform traffic control devices—traffic control for works on roads.
  • AS/NZS 3012: Electrical installations—construction and demolition sites.
  • AS/NZS 2210.3: Personal protective equipment—safety footwear.
  • AS/NZS 4602.1: High-visibility safety garments.
  • AS/NZS 1270: Acoustics—hearing protectors.
  • AS/NZS 1801: Occupational protective helmets.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionCivil Construction and EarthworksPlumbing and Gasfitting

Related templates

$79.50

$96.80

Save $17.30

One-time payment