Our Safe Work Method Statement (SWMS) Template for Tree Care Handlers boasts a range of features meticulously crafted for the unique requirements of your operation:
Pre-filled and Comprehensive: Already kitted out with relevant and thorough documentation, you’ll have peace of mind knowing you’re providing detailed instruction to your team. A comprehensive template means less worry about missing crucial details!
Fully Editable and Customisable: The SWMS is created in Microsoft Word format, giving you remarkable ease in modifying and tailoring the document according to your needs. Amendments? Simple changes? We’ve got you covered.
Project Scope and Details: This feature allows space for outlining the specifics of your project. Keeping everyone on the same page has never been easier.
High Risk Machinery Checklist: Ensure safety precautions are taken around high-risk machinery with this handy checklist. Safeguard your workforce effortlessly.
Staff Training Record Space: Keep track of who’s had what training with ample room for record keeping – a streamlined way to keep tabs on your workforce’s skills and accreditations.
Risk Ratings – Before and After: Compare risk levels pre-and-post mitigation strategies with a clear space for recording these important figures. Monitor how well your measures are working at reducing risk.
Legislative Resources Included: Armed with these resources, compliance will feel less foreign. Building a work culture based on best practices starts here.
Required PPE Listed: A valuable tool that lists required personal protective equipment (PPE). Taking care of your workers’ health and safety, one hard hat at a time.
Risk Assessment & Risk Assessment Matrix: A feature that facilitates thorough, visual risk assessments. It’s never been easier to identify and communicate potential hazards in your workplace.
Checklist for SWMS Requirements: with this checklist, you’ll have the confidence of knowing when all SWMS requirements have been met in your implementation strategies. Tick away to ease your mind!
Workers and Responsible Persons Sign-off Page: Keep transparency and communication front and centre with a designated space for sign-offs from all workers and responsible individuals. Accountability made simple.
Easy to Use and Customise: Our template is user-friendly, making it less of a chore to customise to your specific requirements! We believe in making processes straightforward for you and your team.
Suitable for Large Contracts and Tenders: Ideal for large scale work, including tier 1 contractor work. When the stakes are high, we’ve got you covered with this robust template.
Quick Delivery via Email: In an ever-paced world, we ensure you get what you need swiftly with quick delivery via email. Efficiency? Sorted.
The Tree Care Handler Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Poor work area setup
- incorrect PPE
- 2. Machine inspection
- Undetected defects
- loose components
- 3. Machine startup
- Unauthorised access
- accidental activation
- 4. Operating machine
- Collision
- overturning
- 5. Tree cutting
- Falling branches
- kickback
- 6. Tree handling
- Crushing
- pinching
- 7. Machine shutdown
- Hot surfaces
- hydraulic leaks
- 8. Maintenance
- Improper servicing
- chemical exposure
- 9. Emergency response
- Inadequate evacuation
- injury
- 10. Site cleanup
- Slips
- trips
- and falls
- unsecured loads
- 11. Material disposal
- Improper waste handling
- environmental hazards
- 12. Transporting machine
- Traffic accidents
- unsecured loads
- 13. Machine refueling
- Fuel spillage
- fire hazards
- 14. Tree limb processing
- Entanglement
- flying debris
- 15. Machine attachments
- Incorrect attachment
- release of attachment
- 16. Working near power lines
- Electrocution
- contact with live wires
- 17. Working on uneven terrain
- Machine instability
- slips and falls
- 18. Working in adverse weather
- Reduced visibility
- slippery surfaces
- 19. Working at height
- Falls
- dropped objects
- 20. Communication
- Miscommunication
- lack of coordination
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Tree Care Handler Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


