Tower Crane Safe Work Method Statement (SWMS)

$96.80

The Tower Crane Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Tower Crane Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

Introducing our Safe Work Method Statement Template for Tower Crane – a one-stop, comprehensive template that is absolutely chockers with all the essentials you’ll need. Developed with tradespeople like yourself in mind, it eliminates the faff of paperwork, ensuring your work site is safer and compliant.

Pre-filled and Comprehensive: This isn’t some bare-bones operation! This template comes pre-filled with all the necessary sections needed to document your work details on site. You’ll find it’s comprehensive yet straightforward, without any unnecessary fluff.

Fully editable and customisable in Microsoft Word format: Not everyone works the same way – we get it. That’s why this template is fully editable and customisable in MS Word, so it bends to fit your needs, not the other way ’round.

Includes the scope of the project and the project details: Avoid any confusion by clearly recording the specifics of each job with included sections for project scope and details. It should as clear as a bell.

Includes a checklist of any high-risk machinery on site: Stay ahead of potential risks with the included machinery checklist. It prompts you to identify any potentially troublesome tech on site.

Includes space for recording staff training: Keeping track of who’s trained in what is critical, right? That’s where the dedicated space for recording staff training comes into play. So, nobody’s safety gets left behind in the toolbox.

Includes before and after risk ratings: Spot the difference with before and after risk ratings. They provide a clear visual of how safety measures have reduced danger. Safety first, 100%!

Includes resources for use of legislative references: Don’t worry about the legislative stuff, mate! The template has integrated resources to help you navigate necessary references.

Includes all PPE required: Our template includes a detailed list of all Personal Protective Equipment (PPE) required. No more heading into jobs unprepared.

Includes risk assessment and risk assessment matrix: With an in-depth risk assessment and easy-to-follow matrix, you can zero in on potential hazards and manage them effectively.

Includes a checklist to ensure all requirements have been covered: Not missing a beat, it also features a checklist for ticking off every single requirement when using Safe Work Method Statements (SWMS). Now that’s thorough!

Includes sign-off page for all workers and responsible persons: This handy inclusion ensures accountability from all parties, so everyone’s on the same page – literally.

Easy to use, easy to customise : By keeping things simple and straightforward, we’ve ensured this template is as easy to use as a vegemite sandwich.

Suitable for large contracts and Tenders, including tier 1 contractual work: Newbie or old hand, this template scales up to even the largest contracts and tenders so it’s got your back, no matter the size of the job.

Quick delivery by email: Why wait? After purchasing, we’ll send you the template straight away via email. Speedy, efficient and convenient.


The Tower Crane Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Improper setup
    • lack of personal protective equipment (PPE)
  • 2. Inspection
    • Malfunctioning equipment
    • electrocution
  • 3. Loading
    • Unsecured load
    • overload
  • 4. Lifting
    • Falling loads
    • swing-back
  • 5. Transferring Load
    • Collision
    • destabilisation
  • 6. Offloading
    • Dropping loads
    • injury from manual handling
  • 7. Dismantling
    • Falling parts
    • instability
  • 8. Maintenance
    • Inadequate maintenance
    • fire hazard
  • 9. Emergency Procedures
    • Lack of training
    • slow response time
  • 10. Clean-up
    • Tripping hazards
    • falling from height
  • 11. Storage
    • Incorrect storage
    • theft
  • 12. Security
    • Unauthorized access
    • sabotage
  • 13. Documentation
    • Poor record keeping
    • non-compliance
  • 14. Communication
    • Lack of clear communication
    • misunderstanding of instructions
  • 15. Training
    • Insufficient training
    • unfamiliar with operating procedures
  • 16. Weather conditions
    • Slips and falls
    • wind hazards
  • 17. Works Overhead
    • Injury from falling objects
    • electric hazards
  • 18. Site Control
    • Unsafe site conditions
    • non-compliance to safety standards
  • 19. Disposal
    • Improper disposal
    • harm to environment
  • 20. Third Party Activities
    • Interference with operations
    • safety violations

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Tower Crane Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart