Tilt Up Concrete Panels SWMS

This SWMS covers the erection of tilt-up concrete panels, from reviewing erection documents through to bracing removal and demobilisation.

Activities covered include

  • Review engineered erection documents
  • Install and inspect temporary panel braces
  • Demobilise and manage remaining materials and hazards

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Tilt Up Concrete Panels SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers the erection of tilt-up concrete panels, from reviewing erection documents through to bracing removal and demobilisation. It supports planning and risk management for lifting, panel stability, exclusion zones, plant movements and elevated work.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Review engineered erection documents
  • Establish exclusion zones and site controls
  • Set up crane and associated plant
  • Inspect panels, lifting inserts and lifting gear
  • Lift, rotate and place panels
  • Install and inspect temporary panel braces
  • Complete elevated panel connections
  • Grout and finish panel bases
  • Remove temporary braces
  • Demobilise and manage remaining materials and hazards

Who is this for?

For contractors, workers, supervisors and businesses carrying out tilt-up concrete panel work.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Review engineered erection documents
  • Unplanned panel collapse
  • Incorrect lifting design
  • Inadequate temporary bracing
  • Wind loading
  • Conflicting site activities
Establish site exclusion zones
  • Unauthorised entry
  • Crush from falling panel
  • Plant-person interaction
  • Overhead powerline contact
  • Uneven ground
Set up crane and plant
  • Crane overturning
  • Ground bearing failure
  • Crush from plant movement
  • Swinging counterweight
  • Hydraulic failure
Inspect panels and lifting inserts
  • Panel cracking
  • Insert pull-out
  • Concrete failure
  • Dropped panel
  • Sharp reinforcement
Inspect lifting gear and rig
  • Lifting gear failure
  • Incorrect clutch engagement
  • Unequal sling loading
  • Pinch points
  • Dropped panel
Lift and rotate panel
  • Panel collapse during lift
  • Crush from swinging panel
  • Crane overload
  • Loss of load control
  • High wind
Place panel on footings
  • Crush at panel base
  • Panel overturning
  • Unstable levelling pads
  • Falling objects
  • Hand injuries
Install tilt panel braces
  • Panel collapse
  • Brace buckling
  • Anchor pull-out
  • Crush from brace movement
  • Falls from height
Release crane and inspect bracing
  • Delayed panel movement
  • Brace connection failure
  • Panel overturning
  • Wind-induced movement
  • Unauthorised access
Complete elevated connections
  • Fall from height
  • Falling tools
  • Panel instability
  • EWP collision
  • Welding fumes
Grout and finish panel bases
  • Silica dust
  • Chemical burns
  • Manual handling strain
  • Trips around braces
  • Panel movement
Remove temporary braces
  • Structural collapse
  • Panel overturning
  • Crush from brace release
  • Anchor failure
  • Falling from height
Demobilise and sign off
  • Plant strike
  • Trip hazards
  • Unsecured materials
  • Residual anchor hazards
  • Unauthorised re-entry

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model Code of Practice: Construction work.
  • Model Code of Practice: Managing the risks of plant in the workplace.
  • Model Code of Practice: Managing the risk of falls at workplaces.
  • Model Code of Practice: How to manage work health and safety risks.
  • National Code of Practice for Precast, Tilt-up and Concrete Elements in Building Construction, as guidance.
  • AS 3850:2015 Tilt-up concrete and precast concrete elements for use in buildings.
  • AS 2550.1 Cranes—Safe use, Part 1: General requirements.
  • AS 2550.5 Cranes—Safe use, Part 5: Mobile cranes.
  • AS 1418.5 Cranes, Part 5: Mobile cranes.
  • AS 4991 Lifting devices.
  • AS/NZS 1170.2 Structural design actions—Wind actions.
  • AS 3600 Concrete structures.
  • AS/NZS 1891 Industrial fall-arrest systems and devices.
  • Model WHS laws and model Codes of Practice are guidance unless adopted or otherwise given legal effect in the applicable jurisdiction.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionCivil Construction and EarthworksConcrete and Formwork

Related templates

$79.50

$96.80

Save $17.30

One-time payment