BlueSafe

Tile Saw SWMS

This SWMS covers tile saw cutting work, including area setup, electrical wet supply, equipment checks, cutting, cleaning and pack-down.

Activities covered include

  • Plan tile cutting work
  • Verify dust suppression arrangements
  • Clean slurry and waste, then pack down

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Tile Saw SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers tile saw cutting work, including area setup, electrical wet supply, equipment checks, cutting, cleaning and pack-down. It supports planning and risk management for silica, water, electricity, blade contact, fragments and slurry.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan tile cutting work
  • Establish and control the cutting area
  • Set up the electrical wet supply
  • Inspect the saw and blade
  • Prepare tiles for cutting
  • Verify dust suppression arrangements
  • Start the saw safely
  • Complete straight cuts
  • Complete angled cuts
  • Manage saw faults and jams
  • Clean slurry and waste, then pack down

Who is this for?

For contractors, workers, supervisors and businesses carrying out tile saw cutting work.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan cutting work
  • Silica dust exposure
  • Unsuitable tile material
  • Unplanned work sequence
  • Exposure of bystanders
Establish cutting area
  • Unauthorised entry
  • Flying tile fragments
  • Slips from water spray
  • Noise exposure
  • Trip hazards
Set electrical wet supply
  • Electric shock
  • Electrical lead damage
  • Water contacting electricity
  • Slip from leaking water
  • Fire from electrical fault
Inspect saw and blade
  • Blade burst
  • Contact with blade
  • Guard failure
  • Unexpected start-up
  • Excessive noise and vibration
Prepare tiles for cutting
  • Musculoskeletal strain
  • Cuts from sharp tile edges
  • Tile breakage
  • Finger crush
  • Dropped materials
Verify dust suppression
  • Respirable crystalline silica
  • Water mist containing silica
  • Blocked water feed
  • Slurry overspray
  • Poor ventilation
Start saw safely
  • Blade contact
  • Ejected fragments
  • Unexpected movement
  • Electrical fault
  • Noise
Make straight cuts
  • Laceration from rotating blade
  • Kickback or tile ejection
  • Flying fragments
  • Silica dust exposure
  • Hand-arm strain
  • Noise
Complete angled cuts
  • Blade contact
  • Unstable small offcuts
  • Tile kickback
  • Fragment projection
  • Awkward hand position
Manage faults and jams
  • Unexpected restart
  • Electric shock
  • Blade breakage
  • Cuts during clearing
  • Water overflow
Clean slurry and waste
  • Silica exposure during cleaning
  • Slips on slurry
  • Cuts from offcuts
  • Environmental contamination
  • Manual handling strain
Pack down and sign off
  • Electric shock during pack-up
  • Manual handling strain
  • Trips from leads
  • Unauthorised reuse of defective plant
  • Residual site hazards

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations: apply the relevant local duties for risk management, consultation, plant, electrical risks, hazardous manual tasks, hazardous chemicals, airborne contaminants and PPE.
  • Model Code of Practice: Managing risks of respirable crystalline silica in the workplace — guidance for identifying silica-containing materials, applying the hierarchy of controls, wet processing, restricted areas, RPE, cleaning and monitoring.
  • Model Code of Practice: Managing the risks of plant in the workplace — guidance for safe plant selection, guarding, inspection, maintenance, isolation and operator instruction.
  • Model Code of Practice: Managing electrical risks in the workplace — guidance for electrical equipment, RCD protection, inspection, testing and isolation.
  • Model Code of Practice: Hazardous manual tasks — guidance for reducing lifting, repetitive movement and awkward-posture risks.
  • Model Code of Practice: Managing noise and preventing hearing loss at work — guidance for noise assessment and hearing protection.
  • Technical guidance: AS/NZS 3012 Electrical installations—Construction and demolition sites; AS/NZS 3760 In-service safety inspection and testing of electrical equipment; AS/NZS 1715 and AS/NZS 1716 respiratory protection; AS/NZS 60335.2.69 industrial wet/dry vacuum cleaners; AS/NZS 1270 hearing protectors; AS/NZS 1337.1 eye and face protectors; AS/NZS 2210.3 safety footwear; AS/NZS 4602.1 high-visibility garments.
  • Model WHS laws and model Codes of Practice are guidance and do not automatically have legal effect in every jurisdiction; confirm locally adopted requirements before work starts. Stationary tile saws should use continuous integrated water delivery or suitable M/H-Class dust collection, with controls maintained to manufacturer instructions.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionFlooring and TilingShopfitting and Cabinet Making

Related templates

$79.50

$96.80

Save $17.30

One-time payment