Testing Live Electrical Systems Safe Work Method Statement (SWMS)

$96.80

The Testing Live Electrical Systems Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Testing Live Electrical Systems Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Testing Live Electrical Systems Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Testing Live Electrical Systems Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Testing Live Electrical Systems Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Testing Live Electrical Systems Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Testing Live Electrical Systems Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate training
    • Lack of personal protective equipment (PPE)
  • 2. Visual Inspection
    • Physical hazards
    • Exposure to live conductors
  • 3. Isolate Equipment
    • Electric shock
    • Inadequate de-energised procedures
  • 4. Testing Phase
    • Incorrect test tools
    • Exposure to live parts
  • 5. Diagnostic Activities
    • Hazardous energy
    • Misinterpretation of results
  • 6. Repairing/Replacing Faulty Components
    • Improper tool use
    • Live electric connections
  • 7. Re-Energise Equipment
    • Faulty reconnection methods
    • Electric arc flash
  • 8. Post-Repair Test
    • Failure of equipment
    • Exposure to live parts during testing
  • 9. Documentation Process
    • Insufficient detail in reporting
    • Miscommunication of hazards and risks
  • 10. Disposal of Wastes
    • Exposure to hazardous waste
    • Incorrect waste handling
  • 11. Debrief Team
    • Communication breakdown
    • Misunderstanding of debrief content
  • 12. Equipment Maintenance Checks
    • Inefficient checks
    • Ignorance of maintenance schedule
  • 13. Return Equipment to Store
    • Damage during transport
    • Loss of equipment
  • 14. Review SWMS Compliance
    • Non-compliance to SWMS
    • Overlooking non-compliances
  • 15. Update Safety Data Sheets (SDS)
    • Outdated information
    • Incomplete data entry

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Testing Live Electrical Systems Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart