Temporary Water Installation SWMS
- -100% Compliant with Australian WHS Acts & Regulations
- -Fully Editable MS Word & PDF Formats Included
- -Pre-filled Content - Ready to Deploy Immediately
- -Customisable - Easily Add Your Logo & Site Details
- -Includes 2 Years of Free Compliance Updates
Included with your purchase
Sign in to Blue Safe Portal and download the editable Word or PDF files.
Complete your company profile first if you want us to add your logo, business details and ABN.
One-time purchase. Portal downloads, branding and updates are included for 2 years.
Product Overview
This SWMS covers temporary water installation from planning and work-zone setup through pipework, pumps, testing and reinstatement. It supports work planning and risk management by addressing services, excavation, materials handling, pressurised water and site conditions.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the installation route, supply connection and changing site conditions
- Set up a controlled work zone around services, vehicles, overhead lines and access areas
- Receive and stage materials, pipe and plant
- Excavate the pipe route and manage trench-related hazards
- Prepare bedding and pipe for installation
- Install temporary pipework in the trench or work area
- Join valves and fittings while managing cutting, solvents and leaks
- Connect the water supply and manage isolation, pressure and water release
- Install pumps and hoses while managing electrical and manual handling hazards
- Pressure test and commission the temporary water system
- Inspect, remove temporary works and reinstate the area
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out temporary water installation work.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Pre-start planning |
|
| Set up work zone |
|
| Receive materials and plant |
|
| Excavate pipe route |
|
| Prepare bedding and pipe |
|
| Install temporary pipework |
|
| Join valves and fittings |
|
| Connect water supply |
|
| Install pumps and hoses |
|
| Pressure test and commission |
|
| Inspect, remove and reinstate |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to identify hazards, consult workers, manage risks, provide safe plant and systems of work, and prepare and comply with a SWMS where high risk construction work is involved.
- Model Code of Practice: Construction work (November 2024), as guidance only and subject to adoption or approval in the relevant jurisdiction.
- Model Code of Practice: Excavation work, as guidance only and subject to adoption or approval in the relevant jurisdiction. The Code addresses atmospheric hazards, trench work and hazardous manual tasks.
- Model Code of Practice: Managing the risks of plant in the workplace (June 2020), as guidance only and subject to adoption or approval in the relevant jurisdiction.
- Model Code of Practice: Hazardous manual tasks (October 2018), as guidance only and subject to adoption or approval in the relevant jurisdiction.
- Model Code of Practice: Managing the risk of falls at workplaces, as guidance only and subject to adoption or approval in the relevant jurisdiction.
- Model Code of Practice: Managing risks of hazardous chemicals in the workplace (February 2024), as guidance only and subject to adoption or approval in the relevant jurisdiction.
- Technical guidance: AS/NZS 3500.1 Plumbing and drainage—Water services; AS/NZS 3012 Electrical installations—Construction and demolition sites; AS/NZS 3760 In-service safety inspection and testing of electrical equipment; AS/NZS 4020 Testing of products for use in contact with drinking water; AS 1742.3 Traffic control for works on roads; and relevant water-authority requirements. These standards apply where specified by contract, regulation, authority requirements or design documentation.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
$96.80
Includes all formats + 2 years updates
Included with your purchase
Immediate portal download
Download the editable files as soon as you sign in. Completing your company profile is optional and unlocks our free branding service.
$96.80