Tanker Truck Safe Work Method Statement (SWMS)

$96.80

The Tanker Truck Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Tanker Truck Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

Introducing our top-notch Safe Work Method Statement (SWMS) Template for Tanker Truck. This stellar document is an absolute must-have for managing the safety measures and procedures within your worksite. Let’s take a good squiz at its standout features:

  • Pre-filled and Comprehensive: Our SWMS template relieves the hard yakka of starting from scratch. Packed with relevant content, it provides a thorough guide to various occupational health and safety aspects associated with tanker truck operations.
  • Fully editable and customisable in Microsoft Word format for easy editing: This ain’t a one-size-fits-all gig; our template is flexible enough to accommodate any changes you fancy making. You’re left to nip and tuck until it tickles your organization’s specific needs.
  • Includes the scope of the project and the project details: To get everyone on the same page, it covers all information related to the job at hand – from the overall aim to nitty-gritty tasks.
  • Includes checklist of any high-risk machinery on site: Stay tack sharp about the potential threats by eyeballing the easy-to-follow inventory of dangerous gizmos and contraptions around your worksite.
  • Includes space for recording any staff training: Mad keen about professional development? This feature allows you to chronicle essential upskilling initiatives undertaken by your personnel.
  • Includes before and after risk ratings: This tool helps to yank back those blindfolds and understand how your controls are improving safety. Pre and post risk scores highlight the efficacy of mitigation strategies implemented.
  • Includes resources for use of legislative references: Play ball within legal bounds! With this feature, we offer you a helping hand to navigate OHS laws relevant to tanker truck operations.
  • Includes all PPE required: Items like safety goggles and steel-capped boots get their fair share of attention. By including necessary PPE details, we make sure you know exactly what’s needed to stay safe on site.
  • Includes risk assessment and risk assessment matrix: Risk assessment can be as tricky as a two-dollar watch, so we’ve developed an easy-to-use matrix that summarise risks linked with tanker truck activities and the steps taken to manage them.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: No need to do your head in about whether you’ve got all bases covered. The handy checklist brings peace of mind that everything important has been ticked off.
  • Includes sign off page for all workers and responsible persons: This component ensures all team members understand their responsibilities and boosts accountability among personnel.
  • Easy to use, easy to customise: Champ or no champ at computer stuff – doesn’t matter! This template is straightforward and very user-friendly!
  • Suitable for large contracts and Tenders, including tier 1 contractual work: Suitable for businesses of different sizes, it caters for blue-chip contracts and tenders without breaking a sweat.
  • Quick delivery by email: We respect how flat out you are! Once purchased, the template will be emailed to you in no time.

In essence, our SWMS template can contribute towards ensuring safer workplaces. It serves as a valuable resource to take your health and safety procedures up a notch. While not a silver bullet, it certainly makes life easier, helping you keep the work environment ship-shape and reduce stumbles along the way.


The Tanker Truck Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slip
    • Trip or Fall
    • Hazardous Substance Exposure
  • 2. Site Inspection
    • High Traffic
    • Improper PPE Usage
  • 3. Tanker Inspection
    • Gas Leak
    • Fire or Explosion
  • 4. Equipment Check
    • Faulty Equipment
    • Electrical Shock
  • 5. Loading
    • Spillage
    • Heavy Weight Handling
  • 6. Maneuvering
    • Collision with Other Vehicles
    • Pedestrian Injury
  • 7. Transportation
    • Over speeding
    • Unsecured load
  • 8. Unloading
    • Spillage
    • Heavy Weight Handling
  • 9. Clean Up
    • Hazardous Substance Exposure
    • Slip
    • Trip or Fall
  • 10. Maintenance
    • Incorrect Tool Use
    • Falling Objects
  • 11. Emergency Response Planning
    • Inadequate Training
    • Poor Communication
  • 12. Health Surveillance
    • Long Term Exposure to Chemicals
    • Noise Induced Hearing Loss
  • 13. Review and Update SWMS
    • Outdated Procedures
    • Non-Compliance
  • 14. Accident Reporting
    • Delayed Reporting
    • Miscommunication
  • 15. Staff Training
    • Ineffective Training Methods
    • Lack of Comprehension
  • 16. Regular Equipment Inspection
    • Wear and Tear
    • Faulty Equipment
  • 17. Safety Audits
    • Non-Compliance
    • Inconsistent Enforcement
  • 18. PPE Checks
    • Inadequate PPE
    • Worn out PPE
  • 19. Breakdown Management
    • Unattended Vehicle
    • Unsafe Parking Spot
  • 20. Documentation and Record Keeping
    • Falsified Records
    • Lost Documents

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Tanker Truck Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart