Swimming Pool Plumbing Work SWMS
This SWMS covers planning, trench work, pipework installation, testing and handover for swimming pool plumbing work.
Activities covered include
- Plan the work sequence and emergency arrangements
- Install underground pipework
- Backfill, reinstate, demobilise and hand over
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers planning, trench work, pipework installation, testing and handover for swimming pool plumbing work. It supports managing risks from services, excavation, plant, pressure testing and water release.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the work sequence and emergency arrangements
- Set up and control the work area
- Locate and isolate existing services
- Position plant, pipes and materials
- Excavate plumbing trenches and prepare bedding
- Install underground pipework
- Core drill required penetrations
- Connect plant room equipment
- Pressure test pipework
- Commission pool hydraulics
- Backfill, reinstate, demobilise and hand over
Who is this for?
For contractors, workers, supervisors and businesses carrying out swimming pool plumbing work.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Pre-start planning |
|
| Set up work area |
|
| Locate and isolate services |
|
| Position plant and materials |
|
| Excavate plumbing trenches |
|
| Prepare trench bedding |
|
| Install underground pipework |
|
| Core drill penetrations |
|
| Connect plant room equipment |
|
| Pressure test pipework |
|
| Commission pool hydraulics |
|
| Backfill and reinstate |
|
| Demobilise and hand over |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Applicable plumbing, building, electrical safety, environmental protection and utility-owner requirements in the jurisdiction where the work is performed.
- Model Code of Practice: Construction Work, including SWMS requirements for high risk construction work; an in-ground swimming pool and associated pipelines are examples of construction work structures.
- Model Code of Practice: Excavation Work, including hazard identification, hierarchy of controls, trench atmosphere and manual-work controls.
- Model Code of Practice: Managing the Risks of Plant in the Workplace, including hierarchy-of-control principles for mobile plant and lifting plant.
- Model Code of Practice: Managing Electrical Risks in the Workplace, including isolate, lock, tag, test and re-test practices.
- Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace.
- Model Code of Practice: Managing Respirable Crystalline Silica Dust Exposure in Construction and Manufacturing of Construction Elements.
- Technical guidance: AS/NZS 3500 Plumbing and drainage series; AS/NZS 1477 PVC pipes and fittings; AS/NZS 4130 polyethylene pipes; AS/NZS 3000 Wiring Rules; AS 1926.3 Swimming pool safety; AS/NZS 1715 and AS/NZS 1716 respiratory protective equipment; AS/NZS 1337.1 eye and face protection; AS/NZS 2161.1 protective gloves; AS/NZS 2210.3 safety footwear; AS/NZS 4602.1 high-visibility garments; AS/NZS 1270 hearing protectors. Confirm current editions and jurisdictional adoption before use.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment