Swimming Pool Plumbing Work Safe Work Method Statement (SWMS)

$96.80

The Swimming Pool Plumbing Work Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Swimming Pool Plumbing Work Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Swimming Pool Plumbing Work Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Swimming Pool Plumbing Work Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Swimming Pool Plumbing Work Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Swimming Pool Plumbing Work Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Swimming Pool Plumbing Work Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips
    • trips
    • and falls
    • Equipment malfunction
  • 2. Site Set Up
    • Inadequate workspace
    • Noise pollution
  • 3. Identify Work Area
    • Poor lighting
    • Improper signage
  • 4. Unload Tools and Materials
    • Manual handling injuries
    • Falling objects
  • 5. Clear Debris
    • Punctures or cuts
    • Exposure to hazards
  • 6. Dig Trenches
    • Wall collapse
    • Striking utilities
  • 7. Install Plumbing
    • Tool misuse
    • Inadequate PPE
  • 8. Test Plumbing
    • Water damage
    • Inadequate testing
  • 9. Backfilling and Compacting
    • Struck by moving vehicle
    • Manual handling injuries
  • 10. Clean Site
    • Slips
    • trips
    • and falls
    • Exposure to hazardous substances
  • 11. Documentation and Reporting
    • Miscommunication
    • Data loss
  • 12. Dismantle Set Up
    • Falling objects
    • Manual handling injuries
  • 13. Load Tools and Materials
    • Manual handling injuries
    • Falling objects
  • 14. Asset Inspection
    • Missed faults
    • Incorrect operation
  • 15. Using Plant and Equipment
    • Equipment malfunction
    • Noise pollution
  • 16. Traffic Management
    • Collision with vehicles
    • Poor visibility
  • 17. Emergency Plan Implementation
    • Ineffective response
    • Lack of training
  • 18. Maintain Workplace Health and Safety
    • Mental stress
    • Unhygienic conditions
  • 19. Review Work Completion
    • Overlooking faults
    • Incorrect reporting
  • 20. End Work and Leave Site
    • Slips
    • trips
    • and falls
    • Exposure to hazards

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Swimming Pool Plumbing Work Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart