Staging And Scaffolding Erection Safe Work Method Statement (SWMS)

$96.80

The Staging And Scaffolding Erection Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Staging And Scaffolding Erection Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Staging And Scaffolding Erection Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Staging And Scaffolding Erection Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Staging And Scaffolding Erection Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Staging And Scaffolding Erection Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Staging And Scaffolding Erection Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping over loose objects
    • Exposure to harmful substances
  • 2. Transporting Equipment
    • Injury from transportation vehicles
    • Heavy lifting injuries
  • 3. Erecting Scaffolding
    • Falling from height
    • Inadequate training
  • 4. Inspecting Scaffolding
    • Structural failure
    • Inadequate inspection skills
  • 5. Working on Scaffold
    • Collision with overhead power lines
    • Slips and trips
  • 6. Dismantling Scaffolding
    • Falling objects
    • Cuts from sharp edges
  • 7. Packing up Equipment
    • Incorrect manual handling
    • Misplacemnt of heavy objects
  • 8. Cleaning Site
    • Risk of electrocution
    • Tripping over debris
  • 9. Reporting Incidents
    • Failure to report safety incidents
    • Miss-communication
  • 10. Equipment Maintenance
    • Improper handling of tools
    • Faulty equipment
    • lack of maintenance
  • 11. Staff Training
    • Insufficient training
    • Inadequate knowledge of risks
  • 12. Safety Checks
    • Risks overlooked
    • not understanding safety protocol
  • 13. Health monitoring
    • Failure to monitor health status
    • Exposure to hazardous substances
  • 14. Emergency Procedures
    • Lack of knowledge on emergency procedures
    • Non-adherence to evacuation plans
  • 15. First Aid Response
    • Delayed response
    • Insufficient first aid supplies

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Staging And Scaffolding Erection Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart