Stage Cylinder Rigging Safe Work Method Statement (SWMS)

$96.80

The Stage Cylinder Rigging Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Stage Cylinder Rigging Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Stage Cylinder Rigging Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Stage Cylinder Rigging Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Stage Cylinder Rigging Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Stage Cylinder Rigging Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Stage Cylinder Rigging Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate lighting
    • Tripping hazards
  • 2. Pre-Use Inspection
    • Chemical exposure
    • missing safety equipment
  • 3. Manual Handling
    • Musculoskeletal injuries
    • trips and falls
  • 4. Transporting Materials
    • Vehicle collision
    • Manual handling injuries
  • 5. Cylinder Setup
    • Cylinder falling
    • incorrect setup
  • 6. Rigging Attachment
    • Trips and falls
    • Struck by moving object
  • 7. Safety Checks
    • Incorrect usage of equipment
    • Inadequate inspection
  • 8. Lifting Operations
    • Falling objects
    • structural collapse
  • 9. Detachment Procedure
    • Falling objects
    • entanglement hazards
  • 10. Post-Use Inspection
    • Chemical exposure
    • Extreme weather conditions
  • 11. Maintenance
    • Electrical hazards
    • Chemical hazards
  • 12. Storage Procedures
    • Fire hazard
    • Structural instability
  • 13. Emergency Procedures
    • Panic reactions
    • Incorrect procedures
  • 14. Decontamination Process
    • Chemical exposure from cleaning products
    • slips and falls
  • 15. Waste Disposal
    • Exposure to dangerous substances
    • Incorrect disposal procedures
  • 16. Reporting
    • Inaccurate information
    • delayed reporting
  • 17. Decompression Stops
    • Nitrogen narcosis
    • Barotrauma
  • 18. Cylinder Removal Procedure
    • Musculoskeletal injuries
    • Trips and falls
  • 19. Decommissioning Process
    • Release of harmful substances
    • Fire hazard
  • 20. Clean-Up Operations
    • Exposure to hazardous substances
    • Slips and falls due to wet surfaces

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Stage Cylinder Rigging Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart