Soil Stabiliser Safe Work Method Statement (SWMS)

$96.80

The Soil Stabiliser Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Soil Stabiliser Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

Introducing our robust and carefully constructed Safe Work Method Statement Template for Soil Stabiliser.

  • Pre-filled and Comprehensive: This template comes pre-populated with essential information, reducing your time commitment and allowing you to focus on important tasks. It’s thorough, addressing all critical safety aspects of your project.
  • Fully editable and customisable in Microsoft Word format: Compliments to the wizards at Microsoft, as this template is versatile and easy to modify to fit the specifics of your projects. You don’t need advanced tech skills – just a basic understanding of Word.
  • Includes the scope of the project and the project details: Every bit of necessary detail goes into our template, from outlining the project scope to specifying the nitty-gritties of works involved. Trust us, Mum wasn’t lying when she said the devil is in the details.
  • Checklist of any high-risk machinery on site: This isn’t just about soil stabilisation – it’s also about considering every potentially dangerous machine on your site. We’ve got a comprehensive checklist for that!
  • Space for recording any staff training: Training is fundamental in maintaining workplace safety. Our template has ample room for updating records about who’s been trained, when, and what the training covered.
  • Before and after risk ratings: Because watching things improve is satisfying, right? Well, for this, we have integrated sections for before and after risk assessments, so you can see and show off the progress.
  • Resources for use of legislative references: Ignorance of the law is no excuse. That’s why our template packs resources to help you understand and apply applicable legislation and regulations. It’s like your personal mini law library.
  • All PPE required: We can’t stress enough on safety! We highlight all the necessary Personal Protective Equipment (PPE) required for each task involved. Nothing should get past these safety gatekeepers.
  • Risk assessment and risk assessment matrix: Risk is a part of life, more so in your line of work. That’s why our template facilitates a thorough risk assessment alongside a visual risk matrix. Makes dealing with risks less risky, doesn’t it?
  • Checklist to ensure all requirements have been covered when implementing the SWMS: We’ve got your back here too. An all-inclusive checklist guarantees you don’t miss out anything critical while implementing the SWMS. It’s like that friend who never lets you forget your phone at the pub!
  • Sign off page for all workers and responsible persons: Responsibility isn’t hazy or spread thin in our books. There’s a dedicated sign off area where all working personnel and leaders attest to understanding and adhering to safety protocols. Now that’s teamwork!
  • Easy to use, easy to customise: Because nobody has time for complicated stuff. Our design philosophy? If it isn’t simple, it isn’t worth it. So expect nothing but user-friendly navigation throughout.
  • Suitable for large contracts and Tenders, including tier 1 contractual work: Power packed to cater to significant projects and top-tier contracts. Whether it’s for city councils or multinational corporations, we’ve made this fit as fiddle
  • Quick delivery by email: Waiting is dreadful, therefore, we deliver lightning-fast right to your inbox. No mucking around with snail mail.

Our Safe Work Method Statement Template for Soil Stabiliser is a neat package, designed with the ethos of practicality and compliance. We’re not about making big brash claims – we believe in our product’s capacity to help your project’s health and safety management. But remember, this is a tool, its effectiveness lies in how you choose to use it!


The Soil Stabiliser Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Trips
    • Falls
    • Lifting Injuries
  • 2. Site Inspection
    • Traffic Accidents
    • Inclement Weather
  • 3. Plant and Equipment setup
    • Faulty Equipment
    • Noise Pollution
  • 4. Soil Stabilisation Process
    • Dust Inhalation
    • Unstable Ground
  • 5. Use of Chemical Agents
    • Toxic Exposure
    • Fire Hazard
  • 6. Quality Control Measures
    • Incorrect Measurement
    • Non-compliance
  • 7. Maintenance Work
    • Electrical Shocks
    • Cuts or Abrasions
  • 8. Site Clean Up
    • Improper waste disposal
    • Trip Hazard
  • 9. Documentation Update
    • Mistakes in Records
    • Miscommunication
  • 10. Team Briefings
    • Lack of Information
    • Misunderstanding Instructions
  • 11. Safety Equipment Check
    • Deterioration
    • Inadequate Protection
  • 12. Emergency Drills
    • Panic
    • Inadequate Response
  • 13. Equipment Refuelling
    • Fire Explosions
    • Spillage Hazard
  • 14. Stabiliser Operation
    • Entrapment
    • Overturning
  • 15. Final Inspection
    • Missing Defects
    • Rushing Process
  • 16. Feedback Session
    • Negativity
    • Letdown Feelings
  • 17. Demobilising the site
    • Accidental Damage
    • Property Loss
  • 18. Reporting Incidents
    • False Information
    • Panic/hysteria
  • 19.Transportation Off-site
    • Road Accidents
    • Load Shift
  • 20. Review and Update procedures
    • Outdated Procedures
    • Inadequate Changes

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Soil Stabiliser Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart