Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Slab Polisher Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Trip hazards
- Equipment malfunction
- 2. Set Up
- Incorrect machine setup
- Electrical hazards
- 3. Inspection
- Caught in machinery
- Manual handling injuries
- 4. Initial Polishing
- Exposure to airborne dust
- Noise hazards
- 5. Edge Polishing
- Hand/finger injuries
- Strain from repetitive motion
- 6. Cleaning
- Slippery floor
- Chemical exposure
- 7. Sealing
- Misapplication of sealer
- Incomplete drying
- 8. Final Polishing
- Burn risks
- Electric shock hazards
- 9. Quality Check
- Eye strain
- Fatigue
- 10. Cleaning Machine
- Electric shock
- Pinch points
- 11. Maintenance
- Unexpected start-up
- Improper lockout-tagout procedures
- 12. Transportation
- Risk of dropping slab
- Collisions during transport