Safe Work Method Statement Template for Side Loader Trailer:
This tailored, pre-filled and comprehensive Safe Work Method Statement Template provides a systematic approach to managing safety risks in your work environment. Easy to use and customise, this document is crafted with the needs of tradespeople in mind.
- Pre-filled and Comprehensive: This SWMS template comes packed with relevant data. It takes the hard yards out of your safety documentation, so you can focus on what’s important – getting the job done safely.
- Fully Editable: Available in Microsoft Word format, it offers total freedom for editing. You can effortlessly add or delete information to suit your project’s unique requirements and conditions.
- Includes Scope and Project Details: No stone is left unturned when it comes to project specifics. From an overview of tasks to precise scheduling, all vital elements are included.
- Machinery Checklist: Identify any high-risk machinery on site effectively. This built-in checklist facilitates comprehensive equipment verification.
- Training Records: Included sections for recording staff training promote transparency and safeguard employee competency levels.
- Risk Ratings: The before-and-after risk ratings feature allows you to monitor changes in risk levels. It’s an effective tool for highlighting the effectiveness of your safety measures.
- Legislative References: We’ve got your back with resources for legislative references. You won’t have to rack your brains or trawl the web — we’ve already compiled it.
- Required PPE Detailed: Providing a list of all Personal Protective Equipment needed for the job, it serves as your go-to guide for worker gear-up activities.
- Risk Assessment: This template takes a matrix-style approach towards risk evaluation ensuring a more efficient handling of potential safety hazards.
- Implementation Checklist: To ensure the SWMS is implemented effectively, we’ve provided a comprehensive checklist to ensure all requirements have been covered appropriately.
- Signed Off By Responsible Persons: A sign-off page for all workers and responsible persons is included. It provides a clear record of responsibility and acknowledgement.
- Suitable for Larger Contracts: This professional-grade template stands up to the demands of major contracts, including tier 1 contractual work.
- Email Delivery: No waiting around – your template will be swiftly delivered via email. As quick as a whip, you’ll be able to get started on your project.
Remember, this tool is designed to assist with managing health and safety in the workplace. It doesn’t offer guarantees. Even with this beautifully crafted template within your grasp, always remember to approach every job with utmost vigilance and care.
The Side Loader Trailer Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Inadequate training
- Lack of safety gear
- 2. Inspecting Equipment
- Faulty equipment
- Lack of maintenance
- 3. Loading Trailer
- Falling objects
- Slips and trips
- Manual handling injuries
- 4. Transporting Load
- Vehicle accident
- Overturning vehicle
- 5. Unloading Trailer
- Falling objects
- Manual handling injuries
- 6. Returning Trailer to Base
- Traffic hazards
- Fatigue
- 7. Maintenance & Cleaning
- Exposure to hazardous substances
- Cuts and Abrasions
- 8. Emergency Procedures
- Inadequate training
- Panic under stress
- 9. PPE Use
- Incorrect use of PPE
- PPE failure
- 10. Health Monitoring
- Inadequate health monitoring programs
- Exposure to harmful contaminants
- 11.Safety Communication
- Miscommunication
- Ignoring instructions/health warnings
- 12.Hazard Identification
- Unidentified Risks
- Improper Risk assessment
- 13. Workplace Design
- Cluttered workspace
- Trip hazards
- Poorly maintained equipment
- 14.Managing Weather Conditions
- Heatstroke
- Hypothermia
- Slips on wet surfaces
- 15.Risk Management
- Poor execution of risk management plan
- Unforeseen risks
- 16.Driving Vehicle
- Fatigue
- Ignoring traffic rules and signs
- 17.Docking Trailer
- Incorrect positioning
- Mishandling of controls
- 18.Storing Equipment
- Misplaced equipment
- Inadequate security
- 19.Documentation & Reporting
- Lack of attention to detail
- Errors in documentation
- 20.Review & Revision
- Rigid safety plan
- Lack of timely revision
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Side Loader Trailer Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


