Activities covered include
- Review design information and plan the work
- Assemble frames at ground level
- Complete finishing work, clean up and hand over
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers planning and constructing a shed, from site set-up, footings and slab work through frame erection, cladding and finishing. It supports work planning and risk management for structural, excavation, access, lifting, plant, electrical and weather-related hazards.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Review design information and plan the work
- Set up the site and access arrangements
- Receive and unload materials
- Set out, excavate and form footings
- Pour the slab and install anchors
- Inspect access equipment and tools
- Assemble frames at ground level
- Erect columns and wall frames
- Install the roof structure
- Fix roof and wall cladding
- Construct an awning or pergola
- Complete finishing work, clean up and hand over
Who is this for?
For contractors, workers, supervisors and businesses carrying out shed construction work.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Review design and plan work |
|
| Set up site and access |
|
| Receive and unload materials |
|
| Set out footings and anchors |
|
| Excavate and form footings |
|
| Pour slab and install anchors |
|
| Inspect access and equipment |
|
| Assemble frames at ground level |
|
| Erect columns and wall frames |
|
| Install roof structure |
|
| Fix roof and wall cladding |
|
| Construct awning or pergola |
|
| Complete electrical and finishing work |
|
| Clean up and hand over |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model WHS Regulations guidance: high risk construction work, SWMS, falls, plant, electrical risks and construction-work duties. Confirm the enacted requirements in the jurisdiction where the work is performed.
- Model Code of Practice: Construction work (current edition), including guidance that sheds, carports, pergolas and awnings are structures and that a SWMS is required for high risk construction work.
- Model Code of Practice: Managing the risk of falls at workplaces.
- Model Code of Practice: Managing risks of plant in the workplace.
- Model Code of Practice: Managing electrical risks in the workplace.
- Model Code of Practice: Excavation work, where footing excavations are undertaken; use competent operators, suitable plant and traffic-management arrangements.
- Model Code of Practice: Managing risks of hazardous chemicals in the workplace, including SDS, storage and handling requirements.
- Model Code of Practice: Scaffolding, supported by AS/NZS 1576 series and AS/NZS 4576.
- Technical guidance: AS/NZS 1891 series industrial fall-arrest systems; AS/NZS 5532 single-point anchor devices; AS 1657 fixed platforms, walkways, stairways and ladders; AS/NZS 3012 construction and demolition electrical installations; AS/NZS 3760 in-service safety inspection and testing of electrical equipment; AS 2550 series cranes; AS 1418 series lifting appliances; AS 4991 lifting devices; and AS 1319 safety signs.
- Model laws and model Codes are guidance only and do not automatically have legal effect in every jurisdiction; verify local enactments, regulator codes, electricity-network rules, planning conditions and building approvals before work starts.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
One-time payment