This SWMS covers planning and constructing a shed, from site set-up, footings and slab work through frame erection, cladding and finishing.

Activities covered include

  • Review design information and plan the work
  • Assemble frames at ground level
  • Complete finishing work, clean up and hand over

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Shed Construction SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers planning and constructing a shed, from site set-up, footings and slab work through frame erection, cladding and finishing. It supports work planning and risk management for structural, excavation, access, lifting, plant, electrical and weather-related hazards.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Review design information and plan the work
  • Set up the site and access arrangements
  • Receive and unload materials
  • Set out, excavate and form footings
  • Pour the slab and install anchors
  • Inspect access equipment and tools
  • Assemble frames at ground level
  • Erect columns and wall frames
  • Install the roof structure
  • Fix roof and wall cladding
  • Construct an awning or pergola
  • Complete finishing work, clean up and hand over

Who is this for?

For contractors, workers, supervisors and businesses carrying out shed construction work.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Review design and plan work
  • Incorrect design information
  • Unstable construction sequence
  • Untrained workers
  • Uncontrolled weather exposure
Set up site and access
  • Unauthorised entry
  • Vehicle-pedestrian collision
  • Uneven ground
  • Overhead service contact
Receive and unload materials
  • Crush from suspended load
  • Forklift strike
  • Falling steel bundles
  • Manual-handling strain
  • Sharp sheet-metal edges
Set out footings and anchors
  • Underground services strike
  • Incorrect footing location
  • Trip hazards
  • Exposure to silica dust
Excavate and form footings
  • Excavation collapse
  • Plant roll-over
  • Underground service damage
  • Concrete burns
  • Open-hole fall
Pour slab and install anchors
  • Concrete pump hose movement
  • Wet concrete exposure
  • Slips on wet surfaces
  • Anchor failure
  • Manual-handling strain
Inspect access and equipment
  • Fall from access equipment
  • Defective electrical tools
  • Scaffold collapse
  • EWP overturn
  • Falling tools
Assemble frames at ground level
  • Sharp edges
  • Frame instability
  • Pinch points
  • Manual-handling strain
  • Power-tool injury
Erect columns and wall frames
  • Frame collapse
  • Crush from swinging frame
  • Fall over 2 metres
  • Dropped objects
  • Mobile plant movement
Install roof structure
  • Fall over 2 metres
  • Roof-frame collapse
  • Falling members
  • Crush from lifting
  • Wind-blown materials
Fix roof and wall cladding
  • Fall from roof edge
  • Fall through sheeting
  • Sharp metal edges
  • Falling sheets
  • Wind uplift
  • Noise and metal fragments
Construct awning or pergola
  • Cantilever-frame instability
  • Fall over 2 metres
  • Crush from suspended beams
  • Dropped tools
  • Incorrect connections
Complete electrical and finishing work
  • Electric shock
  • Damaged temporary leads
  • Cuts from flashings
  • Sealant exposure
  • Work at height
Clean up and hand over
  • Residual structural instability
  • Sharp waste
  • Plant strike
  • Unauthorised access
  • Incomplete safety controls

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model WHS Regulations guidance: high risk construction work, SWMS, falls, plant, electrical risks and construction-work duties. Confirm the enacted requirements in the jurisdiction where the work is performed.
  • Model Code of Practice: Construction work (current edition), including guidance that sheds, carports, pergolas and awnings are structures and that a SWMS is required for high risk construction work.
  • Model Code of Practice: Managing the risk of falls at workplaces.
  • Model Code of Practice: Managing risks of plant in the workplace.
  • Model Code of Practice: Managing electrical risks in the workplace.
  • Model Code of Practice: Excavation work, where footing excavations are undertaken; use competent operators, suitable plant and traffic-management arrangements.
  • Model Code of Practice: Managing risks of hazardous chemicals in the workplace, including SDS, storage and handling requirements.
  • Model Code of Practice: Scaffolding, supported by AS/NZS 1576 series and AS/NZS 4576.
  • Technical guidance: AS/NZS 1891 series industrial fall-arrest systems; AS/NZS 5532 single-point anchor devices; AS 1657 fixed platforms, walkways, stairways and ladders; AS/NZS 3012 construction and demolition electrical installations; AS/NZS 3760 in-service safety inspection and testing of electrical equipment; AS 2550 series cranes; AS 1418 series lifting appliances; AS 4991 lifting devices; and AS 1319 safety signs.
  • Model laws and model Codes are guidance only and do not automatically have legal effect in every jurisdiction; verify local enactments, regulator codes, electricity-network rules, planning conditions and building approvals before work starts.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionCarpentry and Joinery

Related templates