Scrap Metal Collection Safe Work Method Statement (SWMS)

$96.80

The Scrap Metal Collection Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Scrap Metal Collection Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

“`html

Looking for a reliable and user-friendly Safe Work Method Statement (SWMS) Template for Scrap Metal Collection? You’ve come to the right place! Our SWMS template is designed to keep your workplace safe, compliant, and efficient. Here’s what it has to offer:

Key Features:
  • Pre-filled and Comprehensive: To make your life easier, our SWMS comes pre-filled with relevant details about scrap metal collection tasks. It’s been carefully curated based on industry standards.
  • Fully editable and customisable in Microsoft Word format for easy editing: This template is delivered in an easily modifiable Word document so you can effortlessly adjust any details to suit your specific needs.
  • Includes the scope of the project and the project details: We’ve included sections where you can outline the scope and specifics of your project, ensuring all aspects are covered.
  • Includes checklist of any high risk machinery on site: Safety first! There’s a built-in checklist to record any high-risk machinery involved in the scrap metal collection process.
  • Includes space for recording any staff training: Keep track of staff training records with dedicated sections within the template to note down who’s trained and when they received their training.
  • Includes before and after risk ratings: Evaluate and note risk levels both before and after implementing safety measures using our straightforward risk rating system.
  • Includes resources for use of legislative references: It includes room for legislative references pertinent to your operations, helping ensure compliance.
  • Includes all PPE required: A handy section to list out all personal protective equipment necessary for the job, making sure everyone is informed and equipped properly.
  • Includes risk assessment and risk assessment matrix: Perform thorough risk assessments with ease, thanks to the included risk assessment matrix.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: Before putting the SWMS into action, go through our comprehensive checklist to ensure no detail has been left out.
  • Includes sign off page for all workers and responsible persons: Everyone on the team can confirm their understanding and agreement by signing off on the provided sign-off page.
  • Easy to use, easy to customise: Designed with simplicity in mind, this template is not just straightforward but customisable to match your unique business requirements.
  • Suitable for large contracts and Tenders, including tier 1 contractual work: Whether you’re tackling large projects or working under Tier 1 contracts, our SWMS template is versatile enough to handle the job.
  • Quick delivery by email: Get your template almost instantly with quick delivery to your email inbox, so you can start working on it without any delay.

We’re here to help you maintain a safe workplace while collecting scrap metal. Utilise our SWMS template to simplify procedures, ensure compliance, and prioritise safety with ease.

“`


The Scrap Metal Collection Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Poor weather conditions
    • lack of PPE
  • 2. Site Arrival
    • Traffic hazards
    • unfamiliar site layout
  • 3. Site Induction
    • Miscommunication
    • unawareness of site-specific hazards
  • 4. Equipment Inspection
    • Faulty tools
    • improper machine maintenance
  • 5. Manual Handling
    • Strains and sprains
    • dropped objects
  • 6. Loading Materials
    • Overloading
    • falling materials
  • 7. Securing Load
    • Improper tying
    • unsecured cargo
  • 8. Transportation
    • Road accidents
    • load shifting
  • 9. Unloading Materials
    • Material spillage
    • tripping hazards
  • 10. Sorting Materials
    • Cuts from sharp edges
    • exposure to hazardous materials
  • 11. Cutting Materials
    • Flying debris
    • equipment malfunction
  • 12. Storing Scrap Metal
    • Incorrect stacking
    • limited space availability
  • 13. Waste Management
    • Improper disposal
    • environmental contamination
  • 14. Housekeeping
    • Slips
    • trips and falls
    • poor visibility
  • 15. Communication
    • Lack of coordination
    • incomplete handover of information
  • 16. Emergency Procedures
    • Panic during emergencies
    • inadequate first aid resources
  • 17. End of Day Procedures
    • Non-compliance with shutdown procedures
    • theft or vandalism
  • 18. Post-job Review
    • Oversights in risk assessment
    • failure to document findings
  • 19. Training and Updates
    • Outdated skills
    • non-compliance with new regulations

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Scrap Metal Collection Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart