“`html
Looking for a reliable and user-friendly Safe Work Method Statement (SWMS) Template for Scrap Metal Collection? You’ve come to the right place! Our SWMS template is designed to keep your workplace safe, compliant, and efficient. Here’s what it has to offer:
- Pre-filled and Comprehensive: To make your life easier, our SWMS comes pre-filled with relevant details about scrap metal collection tasks. It’s been carefully curated based on industry standards.
- Fully editable and customisable in Microsoft Word format for easy editing: This template is delivered in an easily modifiable Word document so you can effortlessly adjust any details to suit your specific needs.
- Includes the scope of the project and the project details: We’ve included sections where you can outline the scope and specifics of your project, ensuring all aspects are covered.
- Includes checklist of any high risk machinery on site: Safety first! There’s a built-in checklist to record any high-risk machinery involved in the scrap metal collection process.
- Includes space for recording any staff training: Keep track of staff training records with dedicated sections within the template to note down who’s trained and when they received their training.
- Includes before and after risk ratings: Evaluate and note risk levels both before and after implementing safety measures using our straightforward risk rating system.
- Includes resources for use of legislative references: It includes room for legislative references pertinent to your operations, helping ensure compliance.
- Includes all PPE required: A handy section to list out all personal protective equipment necessary for the job, making sure everyone is informed and equipped properly.
- Includes risk assessment and risk assessment matrix: Perform thorough risk assessments with ease, thanks to the included risk assessment matrix.
- Includes a checklist to ensure all requirements have been covered when implementing the SWMS: Before putting the SWMS into action, go through our comprehensive checklist to ensure no detail has been left out.
- Includes sign off page for all workers and responsible persons: Everyone on the team can confirm their understanding and agreement by signing off on the provided sign-off page.
- Easy to use, easy to customise: Designed with simplicity in mind, this template is not just straightforward but customisable to match your unique business requirements.
- Suitable for large contracts and Tenders, including tier 1 contractual work: Whether you’re tackling large projects or working under Tier 1 contracts, our SWMS template is versatile enough to handle the job.
- Quick delivery by email: Get your template almost instantly with quick delivery to your email inbox, so you can start working on it without any delay.
We’re here to help you maintain a safe workplace while collecting scrap metal. Utilise our SWMS template to simplify procedures, ensure compliance, and prioritise safety with ease.
“`
The Scrap Metal Collection Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Poor weather conditions
- lack of PPE
- 2. Site Arrival
- Traffic hazards
- unfamiliar site layout
- 3. Site Induction
- Miscommunication
- unawareness of site-specific hazards
- 4. Equipment Inspection
- Faulty tools
- improper machine maintenance
- 5. Manual Handling
- Strains and sprains
- dropped objects
- 6. Loading Materials
- Overloading
- falling materials
- 7. Securing Load
- Improper tying
- unsecured cargo
- 8. Transportation
- Road accidents
- load shifting
- 9. Unloading Materials
- Material spillage
- tripping hazards
- 10. Sorting Materials
- Cuts from sharp edges
- exposure to hazardous materials
- 11. Cutting Materials
- Flying debris
- equipment malfunction
- 12. Storing Scrap Metal
- Incorrect stacking
- limited space availability
- 13. Waste Management
- Improper disposal
- environmental contamination
- 14. Housekeeping
- Slips
- trips and falls
- poor visibility
- 15. Communication
- Lack of coordination
- incomplete handover of information
- 16. Emergency Procedures
- Panic during emergencies
- inadequate first aid resources
- 17. End of Day Procedures
- Non-compliance with shutdown procedures
- theft or vandalism
- 18. Post-job Review
- Oversights in risk assessment
- failure to document findings
- 19. Training and Updates
- Outdated skills
- non-compliance with new regulations
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Scrap Metal Collection Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


