Safe Work Method Statement Template for Sandblasting Machine
The Safe Work Method Statement (SWMS) Template has been especially designed to provide a comprehensive, suitable and easily adaptable framework for your sandblasting project. It has been carefully prepared with all the crucial elements needed for creating a safety plan that complies with Australian WHS regulations.
- Pre-filled and Comprehensive: This template comes partially filled in to guide you through the steps required for documenting your work methods. Its comprehensiveness ensures no crucial aspect is left behind, making it perfectly suited for your project’s requirements.
- Fully Editable and Customisable: Presented in a Microsoft Word format, this SWMS can be effortlessly edited and customised to suit your specific job needs without any complicated formatting or conversion issues.
- Project Scope and Details: It features fields for outlining the specifics of your project including its scope, helping maintain clear, concise communication about what the project involves and hopes to achieve.
- Machinery Checklist: The template includes a helpful checklist to identify any high-risk machinery on site so these can be carefully managed to prevent harm and accidents.
- Staff Training Record: There’s provision for recording staff training which aids in ensuring everyone involved is equipped with appropriate skills for safe operation within their roles.
- Risk Ratings: Lets you record before and after risk ratings, highlighting the effectiveness of control measures implemented.
- Legislative References: To ensure compliance with Australian legislation, even offering resources for cross-referencing legislative requirements as they change over time.
- PPE Requirements: Provides a list of Personal Protective Equipment required for the job, promoting worker safety through correct PPE use.
- Risk Assessment Matrix: An integral part of any WHS scheme is risk mitigation. This SWMS includes a robust risk assessment and detailed matrix to help you identify, evaluate and control potential hazards.
- Requirements Checklist: To ensure nothing important is missed, there’s a checklist to validate that all SWMS requirements have been attended to in the process of implementation.
- Sign off Page: For added accountability, a section has been allocated for workers and responsible persons to formally acknowledge and validate their understanding of the associated risks and controls by signing off.
- Easy to Use & Customise: Navigating your way around this SWMS template is a breeze. Its easy-to-use format means even if you’re not familiar with Word, you can still customise it to best suit your needs.
- Suitability: It is suitable for large contracts and Tenders including tier 1 contractual work.
- Quick Delivery by Email: We respect your time and ensure speedy delivery of the template via email so you can get started with planning as soon as possible.
Please note that while this template serves as a strong foundation, it should be adapted based on the unique circumstances and needs of the task at hand. Despite its comprehensiveness, each different job site will bear its own set of risks that need to be addressed individually. Hence, making sure your final SWMS is tailored specifically towards them is crucial.
The Sandblasting Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Dust inhalation
- Trips and Falls' hazards
- 2. Equipment Check
- Machinery malfunction
- Unplanned machine start
- 3. Setting Up Work Area
- Slippery surfaces
- Inadequate lighting
- 4. Loading Sand
- Manual handling injuries
- Dust inhalation
- 5. Operating Machine
- Noise exposure
- Exposure to flying debris
- 6. Manual Sandblasting
- Skin exposure to abrasive materials
- Eye injury
- 7. Pausing Work
- Unattended machinery
- Unsecured work area
- 8. Cleaning the Work Area
- Hand injuries from cleaning
- Fall injury during cleaning
- 9. Unloading Sand
- Manual handling injuries
- Dust inhalation
- 10. Removing Protective Gear
- Contact with residual abrasive materials
- Tripping over gear
- 11. Machine Maintenance
- Injury from machinery parts
- Electrical shock
- 12. Waste Disposal
- Exposure to hazardous waste
- Heavy lifting injury
- 13. Document Review
- Distraction leading to mistakes
- Misinterpretation of information
- 14. Debriefing Team
- Miscommunication
- Fatigue causing lack of focus
- 15. Packing up Equipment
- Tripping over equipment
- Manual handling injuries
- 16. Leaving Site
- Slips
- trips and falls
- Vehicle-related incident
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Sandblasting Machine Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


