Mobile Crane Operation SWMS

This SWMS covers mobile crane operations, from lift planning and site setup through to load handling, special lifts, emergency response and demobilisation.
Activities covered include
- Plan lifting operations and load paths
- Sling and secure loads
- Respond to emergencies and demobilise the crane
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This SWMS covers mobile crane operations, from lift planning and site setup through to load handling, special lifts, emergency response and demobilisation. It supports planning and managing risks associated with crane stability, loads, access, powerlines, people and changing site conditions.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan lifting operations and load paths
- Arrive at and access the site safely
- Establish work boundaries and control entry
- Inspect the crane and access arrangements
- Position the crane and deploy outriggers
- Configure the crane for the planned lift
- Sling and secure loads
- Conduct a test lift
- Lift and place materials
- Manage blind lifts and communication
- Perform pick-and-carry and special lifts
- Respond to emergencies and demobilise the crane
Who is this for?
Suitable for contractors, workers, supervisors and businesses involved in mobile crane operations and lifting activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan lifting operations |
|
| Arrive and access site |
|
| Establish work boundaries |
|
| Inspect crane and access |
|
| Position and deploy outriggers |
|
| Configure crane safely |
|
| Sling and secure loads |
|
| Conduct test lift |
|
| Lift and place materials |
|
| Manage blind lifts |
|
| Perform pick and carry |
|
| Complete special lifts |
|
| Respond to emergencies |
|
| Maintain and demobilise crane |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, provide safe plant, consult, train, supervise and control high-risk construction work.
- Model Code of Practice: Managing the Risks of Plant in the Workplace.
- Mobile Crane Code of Practice 2024, used as guidance for crane selection, planning, stability, ground support, wind, exclusion zones, erection, dismantling, inspection and maintenance.
- Model Code of Practice: Work near Overhead and Underground Electric Lines, used as guidance for elimination, approach-distance planning, barriers and motion-limiting controls.
- AS 1418.5 Cranes, hoists and winches—Mobile cranes; AS 2550.1 Cranes, hoists and winches—Safe use—General requirements; AS 2550.5 Cranes, hoists and winches—Safe use—Mobile cranes.
- AS 1418.1 Cranes, hoists and winches—General requirements; AS 4991 Lifting devices; AS 3775 Chain slings—Grade T; AS 1353 Flat synthetic-webbing slings; AS 4497 Roundslings; AS 2741 Shackles.
- Use model laws, model Codes and technical standards as guidance only; confirm the legislation, regulator requirements and adopted code status in the state or territory where work is undertaken.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes free branding + 2 years of free updates
$79.50
$96.80
Free branding + 2 years of updates