Roof Tiling SWMS
This SWMS covers roof tiling work from planning, access and material staging through tile laying, cutting, finishing, cleanup and demobilisation.
Activities covered include
- Review the scope, roof conditions and site hazards
- Install underlay and battens
- Remove waste, clean the roof and demobilise
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers roof tiling work from planning, access and material staging through tile laying, cutting, finishing, cleanup and demobilisation. It supports planning and risk management for falls, falling materials, lifting, dust, cutting and changing weather conditions.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Review the scope, roof conditions and site hazards
- Establish exclusion and delivery zones
- Install scaffold, edge protection and roof access systems
- Position the tile elevator or hoist
- Lift and stage roof tiles
- Install underlay and battens
- Lay field roof tiles
- Cut tiles and fit flashings
- Install ridges and pointing
- Manage weather and emergency conditions
- Remove waste, clean the roof and demobilise
Who is this for?
For contractors, workers, supervisors and businesses carrying out roof tiling work.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Review scope and site conditions |
|
| Establish exclusion and delivery zones |
|
| Install scaffold and edge protection |
|
| Set up roof access systems |
|
| Position tile elevator and hoist |
|
| Lift and stage roof tiles |
|
| Install underlay and battens |
|
| Lay field roof tiles |
|
| Cut tiles and fit flashings |
|
| Install ridges and pointing |
|
| Manage weather and emergencies |
|
| Remove waste and clean roof |
|
| Demobilise and sign off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: Construction work.
- Model Code of Practice: Managing the risk of falls at workplaces.
- Model Code of Practice: Managing the risk of falls in housing construction.
- Model Code of Practice: How to manage work health and safety risks.
- Model Code of Practice: Hazardous manual tasks.
- Model Code of Practice: Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements.
- AS/NZS 1576 series Scaffolding; AS/NZS 4576 Guidelines for scaffolding.
- AS/NZS 4994.1 and AS/NZS 4994.2 Temporary roof edge protection for housing and residential buildings.
- AS/NZS 1891 series Industrial fall-arrest systems and devices; AS/NZS 5532 Single-point anchor devices.
- AS 1657 Fixed platforms, walkways, stairways and ladders.
- AS/NZS 1715 and AS/NZS 1716 Respiratory protective equipment.
- AS/NZS 2210.3 Safety protective footwear; AS/NZS 1801 Occupational protective helmets; AS/NZS 1337.1 Eye and face protectors; AS/NZS 1270 Hearing protectors.
- The model Codes and standards are guidance only and must be checked against the WHS/OHS laws applying in the relevant jurisdiction.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$64.95
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$64.95
One-time payment