Roofing Contractors WHS Management System

Coordinate roof work, access, materials handling and contractors through a company-specific WHS system.

Compare the document packages

Plan roof access before materials and crews arrive

Roofing work changes as sheets are removed, openings appear and new material is installed. A roof that is accessible at the start of a job may present a different situation later in the day. Your company system should explain how supervisors plan access, coordinate edge and opening protection, and review weather and material movement throughout the work sequence.

Roof condition and changing openings

Describe how the team obtains information about roof condition, fragile areas and the proposed work sequence. Include the process for reassessment when removal exposes a different surface or changes access to the work area.

Sheets, packs and lifting interfaces

Long sheets and roof packs can interact with wind, site access and lifting equipment. Explain how delivery, unloading and placement are coordinated with the builder, supplier or lifting contractor before workers begin moving material across the roof.

Weather and subcontractor coordination

Set out who reviews changing weather, authorises work changes and communicates the decision to subcontractors. The company process should make responsibility clear where another business provides scaffolding, access equipment or parts of the roof installation.

Core WHS document package

A practical foundation of policies, procedures and management plans for your business.

A$1,490

One-off payment, including GST. For one organisation.

  • WHS management plan and policy
  • Risk, incident and emergency procedures
  • Consultation, contractor and equipment controls
  • Workplace wellbeing and return-to-work documents
Includes 12 months of WHS Core software access from payment.
Buy Core documents

Comprehensive WHS document package

Broader document coverage for complex operations, site work and higher-risk activities.

A$2,490

One-off payment, including GST. For one organisation.

  • Core WHS documents and broader operational coverage
  • Plans for heights, electrical work, chemicals and noise
  • Additional high-risk work and isolation procedures
  • Document control and wider workplace policies
Includes 12 months of WHS Comprehensive software access from payment.
Buy Comprehensive documents

Your package includes company-specific preparation and branding. Access to your delivered documents has no expiry.

Included software access starts from payment and ends automatically. You can choose a software subscription afterwards to continue paid features. Existing subscriptions keep their own billing schedule.

Documents to consider for your work

These industry examples help start the conversation. Tell us which suit your work, what you already have and what you would like to replace. Our team confirms the document scope with you against your selected package before preparation.

  • Working at Heights Management Plan

    Supports planning for roof access, edges, openings and rescue arrangements as the work progresses.

  • Hazardous Manual Tasks Plan

    Helps organise the handling and positioning of sheets, tiles and other materials through delivery and installation.

  • Contractor Management Plan

    Clarifies responsibilities where scaffolding, lifting, labour or specialist roofing activities are provided by another business.

Task-specific SWMS and SOPs can be selected for the work you perform. Check the selected plan's document credits and purchase options in the Portal when deciding what else you need.

Choosing the document scope for roofing contractors

Compare Core with your roofing service and company responsibilities, making the actual access and installation methods clear during review.

Assess Comprehensive for broader roofing operations, multiple subcontractors or varied higher-risk activities. Confirm the relevant plans rather than assuming the package establishes the safe method for every roof.

From your questionnaire to your documents

  1. Choose your document package and complete payment in the Blue Safe Portal.
  2. Complete your company questionnaire. Describe new roofs versus replacement, sheet or tile work, roof condition checks, access methods, lifting arrangements, subcontractors and any asbestos-related interfaces.
  3. Our team prepares and reviews your company documents, then makes them available in your Portal for download.

Put your WHS system to work

Download document and form templates from Documents. Use online forms in your WHS Hub to record inspections, incidents and other safety activities through the workflows included in your plan.

Compare software features, worker limits and document credits to choose the level of support your team needs.

See WHS Hub features and subscriptions

Before you choose

Can the system distinguish new roofing from reroofing?

Yes. Explain the removal sequence, existing roof information and how occupants or other trades are affected. Replacement work can introduce changing openings and uncertain materials that differ from installation onto a new structure.

Will a working-at-heights plan determine the controls for every roof?

No. A company plan can establish responsibilities and planning steps. The roof condition, access, work sequence and chosen equipment still need to be assessed for the particular job, including appropriate rescue arrangements.

How do I access the finished documents?

Your prepared documents are delivered through your Blue Safe Portal account. You can download your delivered files, and document access has no expiry. Online workflows and other paid software features follow your software access period.

Need help choosing the scope for your business? Call 1300 877 609 or send us your requirements.