Roof Plumbing and Guttering SWMS
This SWMS covers planning, roof access, guttering and flashing work, drainage checks and site clean-up.
Activities covered include
- Plan the work and inspect the site
- Install gutter supports
- Test drainage, clean up and demobilise
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers planning, roof access, guttering and flashing work, drainage checks and site clean-up. It supports managing falls, falling materials, sharp edges, plant, electrical and material-handling risks.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the work and inspect the site
- Set up a ground exclusion zone
- Install access and fall protection
- Position plant, materials and equipment
- Remove existing guttering
- Repair fascia and soffits
- Install gutter supports
- Cut gutters and flashings
- Fit gutters and seal joints
- Install valleys and flashings
- Install downpipes and rainwater pipes
- Test drainage, clean up and demobilise
Who is this for?
For contractors, workers, supervisors and businesses carrying out roof plumbing and guttering activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan work and inspect site |
|
| Set up ground exclusion zone |
|
| Install access and fall protection |
|
| Position plant and materials |
|
| Remove existing guttering |
|
| Repair fascia and soffits |
|
| Install gutter supports |
|
| Cut gutters and flashings |
|
| Fit gutters and seal joints |
|
| Install valleys and flashings |
|
| Install downpipes and rainwater pipes |
|
| Test gutters and drainage |
|
| Clean up and demobilise |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, consult workers, provide training, maintain plant and control construction-work risks.
- Model Code of Practice: Construction Work (guidance only; confirm adoption or approval in the applicable jurisdiction).
- Model Code of Practice: Managing the Risk of Falls at Workplaces (guidance only; confirm adoption or approval in the applicable jurisdiction).
- Model Code of Practice: Managing Electrical Risks in the Workplace (guidance only; confirm adoption or approval in the applicable jurisdiction).
- Model Code of Practice: How to Manage Work Health and Safety Risks (guidance only; confirm adoption or approval in the applicable jurisdiction).
- Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace (guidance only; confirm adoption or approval in the applicable jurisdiction).
- AS/NZS 1891 series Industrial fall-arrest systems and devices.
- AS/NZS 4576 Guidelines for scaffolding.
- AS 1657 Fixed platforms, walkways, stairways and ladders.
- AS/NZS 4994 Temporary edge protection.
- AS/NZS 5532 Manufacturing requirements for single-point anchor device used for harness-based work at heights.
- AS/NZS 3012 Electrical installations—Construction and demolition sites.
- AS/NZS 3760 In-service safety inspection and testing of electrical equipment.
- AS 3500.3 Plumbing and drainage—Stormwater drainage.
- AS 1562.1 Design and installation of sheet roof and wall cladding.
- AS/NZS 1715 and AS/NZS 1716 Respiratory protective equipment.
- AS/NZS 2210.3 Safety footwear, AS/NZS 1337.1 Eye and face protection, AS/NZS 1270 Hearing protectors, AS/NZS 1801 Occupational protective helmets and AS/NZS 4602.1 High-visibility safety garments.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment