
Roof Plumbing Activities SWMS
- -100% Compliant with Australian WHS Acts & Regulations
- -Fully Editable MS Word & PDF Formats Included
- -Pre-filled Content - Ready to Deploy Immediately
- -Customisable - Easily Add Your Logo & Site Details
- -Includes 2 Years of Free Compliance Updates
Included with your purchase
Sign in to Blue Safe Portal and download the editable Word or PDF files.
Complete your company profile first if you want us to add your logo, business details and ABN.
One-time purchase. Portal downloads, branding and updates are included for 2 years.
Product Overview
This SWMS covers roof plumbing activities from planning and site setup through roof access, material handling, installation, cutting and demobilisation. It supports work planning and risk management for falls, falling objects, services, sharp materials, hot work, weather and plant interaction.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan roof work and consult with relevant work groups
- Establish an exclusion zone below the work area
- Inspect the roof, structure and nearby services
- Install access arrangements and edge protection
- Check plant, tools and fall gear
- Lift and stage materials for roof work
- Move and work safely on the roof
- Install gutters and downpipes
- Install flashings and roof penetrations
- Cut, fix and seal materials
- Undertake hot-work activities where required
- Manage weather, fatigue, inspection and clean-up
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out roof plumbing activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan work and consult |
|
| Establish site exclusion zone |
|
| Inspect roof and services |
|
| Install access and edge protection |
|
| Check plant and fall gear |
|
| Lift and stage materials |
|
| Move and work on roof |
|
| Install gutters and downpipes |
|
| Install flashings and penetrations |
|
| Cut, fix and seal materials |
|
| Conduct hot-work activities |
|
| Manage weather and fatigue |
|
| Inspect, clean and demobilise |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: Construction Work (guidance only; confirm adoption and any jurisdictional variations).
- Model Code of Practice: Managing the Risk of Falls at Workplaces (guidance only; confirm adoption and any jurisdictional variations).
- Model Code of Practice: How to Manage Work Health and Safety Risks (guidance only; confirm adoption and any jurisdictional variations).
- Model Code of Practice: Managing the Risks of Plant in the Workplace (guidance only; confirm adoption and any jurisdictional variations).
- Model Code of Practice: Managing Electrical Risks in the Workplace (guidance only; confirm adoption and any jurisdictional variations).
- Model Code of Practice: Hazardous Manual Tasks (guidance only; confirm adoption and any jurisdictional variations).
- Model Code of Practice: Managing Noise and Preventing Hearing Loss at Work (guidance only; confirm adoption and any jurisdictional variations).
- Model Code of Practice: How to Manage and Control Asbestos in the Workplace and How to Safely Remove Asbestos (guidance only; confirm adoption and any jurisdictional variations).
- AS/NZS 1891 series Personal equipment for work at height.
- AS/NZS 5532 Single point anchor devices for harness-based work at heights.
- AS/NZS 4576 Guidelines for scaffolding.
- AS/NZS 4994 series Temporary edge protection.
- AS 1892 series Portable ladders.
- AS/NZS 3012 Electrical installations—Construction and demolition sites.
- AS/NZS 1715 and AS/NZS 1716 Respiratory protective equipment.
- AS/NZS 1270 Hearing protectors.
- AS/NZS 1337.1 Personal eye-protection.
- AS/NZS 2210.3 Safety protective footwear.
- AS/NZS 4602.1 High visibility safety garments.
- AS 3745 Planning for emergencies in facilities.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
$96.80
Includes all formats + 2 years updates
Included with your purchase
Immediate portal download
Download the editable files as soon as you sign in. Completing your company profile is optional and unlocks our free branding service.
$96.80