
Roll Former SWMS
- -100% Compliant with Australian WHS Acts & Regulations
- -Fully Editable MS Word & PDF Formats Included
- -Pre-filled Content - Ready to Deploy Immediately
- -Customisable - Easily Add Your Logo & Site Details
- -Includes 2 Years of Free Compliance Updates
Included with your purchase
Sign in to Blue Safe Portal and download the editable Word or PDF files.
Complete your company profile first if you want us to add your logo, business details and ABN.
One-time purchase. Portal downloads, branding and updates are included for 2 years.
Product Overview
This SWMS covers roll former work from pre-start checks and coil loading through forming, stacking, clearing jams, maintenance and handover. It supports planning and risk management for moving machinery, sharp edges, stored energy, manual handling and unauthorised operation.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Complete the pre-start briefing and work-area checks
- Inspect machine safeguards and controls
- Prepare the coil-handling area
- Load coils onto the decoiler
- Thread sheet through the infeed
- Set the profile and machine controls
- Run a trial product
- Produce, stack and bundle formed sections
- Clear jams and misfeeds
- Clean the area and conduct maintenance tasks
- Shut down and hand over the machine
Who is this for?
For contractors, workers, supervisors and businesses carrying out roll former work.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Pre-start briefing |
|
| Inspect machine safeguards |
|
| Prepare coil handling area |
|
| Load coil onto decoiler |
|
| Thread sheet through infeed |
|
| Set profile and controls |
|
| Run trial product |
|
| Produce formed sections |
|
| Stack and bundle product |
|
| Clear jams and misfeeds |
|
| Clean work area |
|
| Conduct maintenance tasks |
|
| Shutdown and handover |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, provide safe plant, maintain guarding, provide training, consult workers, manage hazardous manual tasks, noise, hazardous chemicals and electrical risks.
- Model Code of Practice: How to Manage Work Health and Safety Risks.
- Model Code of Practice: Managing Risks of Plant in the Workplace.
- Model Code of Practice: Hazardous Manual Tasks.
- Model Code of Practice: Managing Noise and Preventing Hearing Loss at Work.
- Model Code of Practice: Managing Electrical Risks in the Workplace.
- Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace.
- Model Code of Practice: First Aid in the Workplace.
- AS 4024.1 series, Safety of machinery, including general principles for risk assessment, guarding and safety-related control systems.
- AS/NZS 3760, In-service safety inspection and testing of electrical equipment.
- AS/NZS 1319, Safety signs for the occupational environment.
- AS/NZS 2550 series and AS 1418 series, where cranes, hoists and lifting equipment are used.
- AS 4991, Lifting devices, where lifting beams, coil hooks or purpose-designed lifting devices are used.
- The model Codes are guidance for adoption by Commonwealth, state and territory jurisdictions and should be checked against the law applying at the workplace. The knowledge base identifies that guarding should prevent bypassing, be maintained, and prevent restart while guards are removed; it also supports isolation and lock-out of electrical, pneumatic, hydraulic, gravity and stored-energy sources.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
$96.80
Includes all formats + 2 years updates
Included with your purchase
Immediate portal download
Download the editable files as soon as you sign in. Completing your company profile is optional and unlocks our free branding service.
$96.80