Introducing our Safe Work Method Statement (SWMS) Template for Road Rollers. This comprehensive digger’s little helper boasts a whole swag of features designed to make your life on site a heck of a lot easier. Let’s break it down:
- Pre-filled and Comprehensive: As thorough as a bush walk with an off-roading enthusiast, this template comes loaded with the necessary information straight off the bat.
- Fully editable and customisable in Microsoft Word format for easy editing: We understand each project is as unique as a quokka’s smile, so we’ve made sure this template can be easily tweaked to suit your specific needs.
- Includes the scope of the project and the project details: Clear as clear skies over Bondi beach, you’ll find sections specifically for detail and scope to keep all stakeholders on topic.
- Includes checklist of any high risk machinery on site: Nip risks at the bud with our robust checklist designed to help you track and manage all hazardous machinery found on site.
- Includes space for recording any staff training: Record who’s been trained up and when. With our SWMS template you can always ensure your workers have the right know-how up their sleeves.
- Includes before and after risk ratings: Gauge potential risks with our handy before and after hazard identification feature.
- Includes resources for use of legislative references: Stay on the right side of the rules. Our links to legislative references offer an extra helping hand.
- Includes all PPE required: Safety starts with good gear. That’s why we’ve included a PPE checklist for all necessary safety equipment.
- Includes risk assessment and risk assessment matrix: Evaluate hazards effectively using our straightforward Risk Assessment tools and Matrix.
- Includes a checklist to ensure all requirements have been covered when implementing the SWMS: No stone unturned here! Our implementation checklist helps you confirm you’ve addressed everything important.
- Includes sign off page for all workers and responsible persons: Accountability matters, mate. Ensure every individual involved signs off on tasks and duties completed.
- Easy to use, easy to customise: User-friendly as a friendly kangaroo, make this template yours in a snap.
- Suitable for large contracts and Tenders, including tier 1 contractual work: Whether it’s a big project or a small gig, this template can match strides with any type of contract or tender, including those high-profile tier 1 jobs.
- Quick delivery by email: As swift as an emu on the sprint, your template will be emailed to you faster than you can say “G’day!”
There you go – a handy tool for the hard-working tradie. Remember, I’m here to lend a hand but, like everyone else, can’t guarantee perfection. What we can promise though is a reliable aide designed with expertise and care in crafting a safer workplace.
The Road Roller Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Poor visibility
- equipment malfunction
- 2. Inspection of machinery
- Inadequate training
- faulty equipment
- electrical hazards
- 3. Operating machine
- Noise exposure
- vibration
- conditions causing rollover
- 4. Maintenance and cleaning
- Risk of a fire outbreak
- chemical hazards from cleaning agents
- 5. Loading and unloading cargo
- Machinery instability
- heavy load risk
- 6. Positioning of safety cones
- Tripping hazard
- moving traffic
- 7. Traffic & pedestrian management
- Risk of collision with moving vehicles
- pedestrians
- 8. Tipping operations
- Roll-over due to uneven ground
- material spillage risks
- 9. Changing attachments
- Equipment failure
- inadequate training
- 10. Refuelling
- Fire hazards from fuel spills
- fume inhalation danger
- 11. Breakdown procedures
- Potential danger from other traffic
- electrical hazards
- 12. Road crossing procedures
- Risk of collision with other traffic
- 13. End of day procedures
- Unauthorized use of machinery
- theft risk
- 14. Machinery parking
- Slipping/Tripping hazard
- potential damage to property
- 15. Leaving work site
- Safety risks associated with darkness or reduced visibility
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Road Roller Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


