Safe Work Method Statement Template for Road Marking Machine: Product Description
- Pre-filled and Comprehensive: Our template comes pre-filled with standard industry information, sparing you the chore of starting from scratch. It’s comprehensive in that it takes into account all possible scenarios involved in operating a road marking machine.
- Fully editable and customisable in Microsoft Word format: Few things are as frustrating as encountering an uneditable document. Our template is fully editable and customisable in Microsoft Word, giving you control to adapt the information to suit your specific needs.
- Includes Project Scope and Details: Often forgotten, yet vital – the scope of your project and its finer details are addressed within this template. This assures everyone on site knows what’s involved and what exactly they’re working towards.
- High Risk Machinery Checklist: Safety is our mantra and this template includes a thorough checklist of any high-risk machinery present on site, to ensure every necessary precaution has been considered.
- Staff Training Record Space: It includes ample space dedicated for noting down any staff training conducted to increase awareness and proficiency, thereby enhancing safety on the job.
- Incorporates Before and After Risk Ratings: An essential element of risk management, these ratings provide a clear visualisation of how effectively safety measures have been implemented and offers areas for improvement.
- Legislative References Included: We’ve gone the extra mile by providing resources for relevant legislative references, saving you the hassle of sourcing them elsewhere.
- PPE Requirements Compiled: To make safety compliance simpler, our template dutifully lists out all necessary Personal Protective Equipment (PPE), ensuring workers wear the right gear at all times.
- Risk Assessment Matrix plus Assessment: Vital risk assessment forms are integrated into the template, accompanied by an easy-to-understand matrix that aids in identifying and managing potential hazards.
- Checklist for SWMS Implementation Requirements: Guaranteeing not a single requirement will be missed, we’ve included a thorough checklist. This is to ensure your Safe Work Method Statement (SWMS) implementation runs smoothly.
- Sign-Off Page for All Workers: Keeping track of who’s read and understood their obligations is made possible with our signed acknowledgement page for all workers and responsible persons.
- Easy to Use, Easy to Customise: We’ve put a great deal of thought into design and usability, making it both straightforward for you to use and tweak to your needs.
- Perfect for Large Contracts and Tenders: Our fully comprehensive template handles tier 1 contractual work or tenders, rather effortlessly.
- Email Delivery at Lightning Speed: Get our template without delay, as we deliver directly to your inbox as soon as payment is cleared.
Please remember, while we endeavour to address everything, safety in the workplace can sometimes be circumstantial. Always aim to stay updated on new safety measures or requirements relevant to your operations! Let’s reduce the risk.
The Road Marking Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Slips and trips
- incorrect use of equipment
- 2. Machine Set-up
- Machine malfunctions
- noise
- 3. Applying Markings
- Traffic accidents
- poor visibility
- 4. Breaks & Rest Periods
- Dehydration
- fatigue
- 5. Clean Up
- Chemical spills
- slips on wet surfaces
- 6. Maintenance
- Equipment break downs
- cuts or abrasions
- 7. Transportation
- Vehicle accidents
- load shifting
- 8. Training
- Incorrect use of machine
- misunderstand instructions
- 9. Inspection
- Failure to spot issues
- miscommunication
- 10. Emergency Response
- Panic reaction
- handling injuries
- 11. Refuelling
- Fuel spills
- fire hazards
- 12. Weather Monitoring
- Slippery surfaces
- poor visibility
- 13. Document Control
- Misinformation
- non-compliance
- 14. Communication
- Non-compliance
- misunderstanding
- 15. Material Handling
- Heavy lifting
- chemical fume inhalation
- 16. Hazard Identification
- Inadequate risk assessment
- overlooked hazards
- 17. PPE Usage
- Incorrect fit
- lack of protection
- 18. Tool Use
- Unexpected breakdown
- injury from improper use
- 19. Work Zone Set Up
- Intrusion of pedestrians or vehicles
- inappropriate signage
- 20. Fatigue Management
- Reduced concentration
- slower reaction times
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Road Marking Machine Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


