Road Construction Civil Earthworks and Grading SWMS

This SWMS covers planning, traffic controls, set-out, access construction, earthworks, grading, pavement stabilisation, curb and seal work, and demobilisation.
Activities covered include
- Plan the work and induct the crew
- Excavate cut and fill areas
- Clean up and demobilise the site
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This SWMS covers planning, traffic controls, set-out, access construction, earthworks, grading, pavement stabilisation, curb and seal work, and demobilisation. It supports planning and risk management by identifying traffic, plant, service, excavation, dust, chemical, hot-material and site-condition hazards.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the work and induct the crew
- Establish traffic controls
- Set out the road alignment
- Construct temporary access roads
- Complete plant pre-start checks
- Strip topsoil and clear the work area
- Excavate cut and fill areas
- Grade and scarify the formation and shoulders
- Stabilise road pavement
- Place and compact base materials
- Install curb and complete sealing work
- Clean up and demobilise the site
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out road construction, civil earthworks and grading activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan work and induct crew |
|
| Establish traffic controls |
|
| Set out road alignment |
|
| Construct temporary access roads |
|
| Complete plant pre-starts |
|
| Strip topsoil and clear |
|
| Excavate cut and fill |
|
| Grade and scarify formation |
|
| Grade road shoulders |
|
| Stabilise road pavement |
|
| Place base and compact |
|
| Install curb and seal |
|
| Clean up and demobilise |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: Construction work (November 2024) — guidance for SWMS preparation, consultation, supervision, review and high risk construction work.
- Model Code of Practice: Managing risks of plant in the workplace — guidance for plant selection, inspection, maintenance, guarding and operator competency.
- Code of Practice: Moving plant on construction sites — guidance for vehicle management plans, pedestrian separation, exclusion zones and site-specific SWMS.
- Model Code of Practice: Excavation work — guidance for service location, excavation controls, plant operation and competent-person inspections.
- Model Code of Practice: Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements — guidance for silica-risk assessment, dust suppression, air monitoring and respiratory protection.
- Model Code of Practice: Managing noise and preventing hearing loss at work.
- Traffic management for construction or maintenance work Code of Practice — guidance for roadworks traffic control and traffic management planning; confirm local road authority requirements before use.
- AS 1742.3 Manual of uniform traffic control devices — Traffic control for works on roads.
- AS 3798 Guidelines on earthworks for commercial and residential developments.
- AS 1289 Methods of testing soils for engineering purposes.
- AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment; AS/NZS 1716 Respiratory protective devices.
- AS/NZS 1801 Occupational protective helmets; AS/NZS 2210.3 Safety footwear; AS/NZS 4602.1 High visibility safety garments; AS/NZS 1270 Hearing protectors.
- AS 2397 Safe use of lasers in the building and construction industry.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes free branding + 2 years of free updates
$79.50
$96.80
Free branding + 2 years of updates