Reroofing Activities Safe Work Method Statement (SWMS)

$96.80

The Reroofing Activities Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Reroofing Activities Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Reroofing Activities Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Reroofing Activities Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Reroofing Activities Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Reroofing Activities Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Reroofing Activities Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Falling materials
    • holes in the existing roof
  • 2. Materials Handling
    • Rough handling causing injury
    • falling objects
  • 3. Removing old roofing materials
    • Exposure to asbestos
    • falling debris
  • 4. Site Clean Up
    • Trips and falls
    • manual handling injuries
  • 5. Setting up scaffolding
    • Unstable structure
    • falling from height
  • 6. Safety checks of equipment
    • Faulty equipment leading to accidents
  • 7. Laying new roofing materials
    • Slippery surface
    • manual handling injuries
  • 8. Cutting and shaping materials
    • Sharp objects
    • dust inhalation
  • 9. Installing insulation
    • Inhalation of insulation fibres
    • Fire hazard
  • 10. Securing roofing materials
    • Accident with power tools
    • melting tar hazards
  • 11. Applying finishing touches
    • Fall from height
    • tripping over tools
  • 12. Inspecting final work
    • Fall from height
    • tripping over tools
  • 13. Dismantling scaffolding
    • Unstable structure
    • falling objects
  • 14. Cleaning and sanitizing tools
    • Cutting self on sharp tools
    • chemical exposure
  • 15. Clearance of work area
    • Tripping over leftover materials
    • sharp objects
  • 16. Disposing waste materials
    • Risk of injury while handling debris
    • hazardous waste disposal
  • 17. Final site assessment
    • Trip and fall hazards
    • remaining sharp objects
  • 18. Documentation and reporting
    • Wrong data recording
    • miscommunication
  • 19. Debriefing team
    • unique fatigue
    • dehydration
  • 20. Leaving site
    • Injury from leftover tools or materials
    • trip hazards

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Reroofing Activities Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart