Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Replace Roof Tiles Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Tripping hazards
- Manual handling injuries
- Exposure to noisy environment
- 2. Safety Briefing
- Miscommunication
- Non-compliance to safety rules
- 3. Site Inspection
- Falling debris
- Trips and falls
- Contact with sharp objects
- 4. Tool Allocation
- Incorrect tool use
- Cuts or lacerations
- Equipment malfunction
- 5. Ladder Placement
- Falls from height
- Ladder instability
- 6. Material Transfer
- Struck by falling objects
- Manual handling injuries
- 7. Roof Access
- Falls from height
- Slips
- trips
- and falls
- 8. Tile Removal
- Dust inhalation
- Eye injuries
- Hand injuries
- 9. Cleaning work area
- Tripping over waste materials
- Inhalation of dust particles
- 10. New Tiles laying
- Incorrect positioning
- Hand injuries
- 11. Fastening new tiles
- Hand injuries
- Power tool malfunctions
- 12. Quality Check
- Incorrectly installed tiles - tripping risk
- Overlooking minor damage
- 13. Clean Up Debris
- Injury from remaining debris
- Handling sharp objects
- 14. Discard Old Tiles
- Manual handling injuries
- Disposal-related hazards
- 15. Final Inspection
- Overlooking minor damage
- Reporting errors
- 16. Debriefing and sign off
- Miscommunication
- Incomplete documentation
- 17. Equipment Return
- Incorrect storage
- Tripping hazards
- 18. Safety Review
- Omission of hazards
- Non-compliance with safety measures
- 19. Documentation
- Missing information
- Errors in data recording
- 20. Completion
- Overlooking damage to property
- Incomplete task completion