Replace Lead Service Pipes Risk Assessment

$79.50

The Replace Lead Service Pipes Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Replace Lead Service Pipes Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The Replace Lead Service Pipes Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • Improper handling of tools
    • Inadequate pre-work inspections
  • 2. Assessing Area
    • Inappropriate safety gear
    • Hazards not correctly identified
  • 3. Equipment Setup
    • Incorrectly set up equipment
    • Manual handling injuries
  • 4. Pipe Removal
    • Physical strain
    • Use of power tools and hand tools
  • 5. Lead Exposure
    • Mishandling lead pipes
    • Inhalation hazards
  • 6. New Pipe Installation
    • Falling objects
    • Slips
    • trips and falls
  • 7. Exposure to Asbestos
    • Unfit PPE
    • Contractors not trained in safe work procedures
  • 8. Soil Contamination Disposal
    • Risk of incorrect soil disposal
    • Potential for environmental contamination
  • 9. System Reconnection
    • Improper connection causing leaks
    • Damages to property due to leaks
  • 10. Testing
    • Faulty equipment
    • Unclear testing protocols
  • 11. Clean Up
    • Slips
    • trips and falls due to improper cleanup
    • Incorrect disposal of waste materials
  • 12. Documentation
    • Inaccurate record keeping
    • Missed hazard reporting
  • 13. Equipment Demobilisation
    • Manual handling injuries
    • Damage to equipment during demobilisation
  • 14. Safety Briefing
    • Miscommunication of safety procedures
    • Lack of focus during briefing
  • 15. Post Work Inspection
    • Missed hazard during inspection
    • Unreliable inspection processes
  • 16. Report Submission
    • Miscommunication of work completion
    • Mistakes in report
  • 17. Site Demobilisation
    • Falls from heights during demobilisation
    • Struck by moving equipment
  • 18. Waste Disposal
    • Inadequate waste disposal facilities
    • Incorrect sorting of disposable items
  • 19. Equipment Maintenance
    • Poor maintenance leading to faulty equipment
    • Late scheduling of maintenance
  • 20. Post-Work Debriefing
    • Inadequate feedback loop
    • Workers not expressing concerns or issues
Shopping Cart