Removing Redundant Equipment Risk Assessment

$79.50

The Removing Redundant Equipment Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Removing Redundant Equipment Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The Removing Redundant Equipment Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • Risk of electrocution
    • falling equipment
  • 2. Disconnection and Isolation
    • Improper de-energising
    • using wrong tools
  • 3. Securing Equipment
    • Unstable footing
    • incorrect restraining
  • 4. Inspection
    • Exposed wiring faults
    • improper maintenance records
  • 5. Dismantling
    • Cutting hazard
    • crushing hazard
  • 6. Removal of Large Parts
    • Falling parts
    • sharp edges
  • 7. Handling Waste Materials
    • Mishandling hazardous wastes
    • contamination exposure
  • 8. Cleaning Area
    • Slipping on oily surfaces
    • tripping over materials
  • 9. Loading for Transport
    • Incorrect lifting technique
    • transport issues
  • 10. Unloading at Designated Site
    • Falls from height
    • collision with other vehicles/structures
  • 11. Final Inspection
    • Overlooking potential residual hazards
    • improper recording
  • 12. Disposal of Equipment
    • Environmental contaminants
    • worker injury during disposal
  • 13. Area Clean-Up
    • Persistent hazardous materials
    • discarding of rubbish improperly
  • 14. Documentation and Reporting
    • Falling objects while documenting
    • distraction causing accidents
  • 15. Review Procedure
    • Inadequate review practices
    • overlooking potential persistent hazards
Shopping Cart