Remove Or Install Tyres Safe Work Method Statement (SWMS)

$96.80

The Remove Or Install Tyres Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Remove Or Install Tyres Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Remove Or Install Tyres Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Remove Or Install Tyres Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Remove Or Install Tyres Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Remove Or Install Tyres Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Remove Or Install Tyres Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Improper workspace set-up
    • Inadequate safety training or measure
  • 2. Equipment Check-Up
    • Faulty tools or equipment
    • Lack of Personal Protective Equipment(PPE)
  • 3. Car Lifting
    • Incorrect lifting techniques
    • Instability of vehicle
  • 4. Deflating Tyre
    • Rapid tyre deflation incidents
    • Over-inflation injuries
  • 5. Tyre Removal
    • Manual handling injuries
    • Rotational forces risks
  • 6. Inspect Removed Tyre
    • Exposure to sharp objects
    • Poor lighting conditions
  • 7. Position New Tyre
    • Strains and sprains
    • Accidental dropping of heavy objects
  • 8. Install New Tyre
    • Misthread or cross thread
    • Over torque
  • 9. Lowering Vehicle
    • Vehicle Instability
    • Unexpected movements from hydraulic devices
  • 10. Pressurisation of Tyre
    • Over-inflation risks
    • Uncontrolled rapid re-pressurization
  • 11. Final balance Check
    • Balancing machine failure
    • Misjudge of weight placement
  • 12. Wheel Cover Installation
    • Crooked wheel cover
    • Injury due to improper installation
  • 13. Job Completion Report
    • Missing necessary details
    • Miscommunication of any existing hazards after job
  • 14. Clean Up
    • Tripping over tools/materials
    • Chemical exposure
  • 15. Safety Review
    • Overlooking safety concerns
    • Complacency towards safety

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Remove Or Install Tyres Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart