Removal Or Alteration Of Structural Components Risk Assessment

$79.50

The Removal Or Alteration Of Structural Components Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Removal Or Alteration Of Structural Components Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The Removal Or Alteration Of Structural Components Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • Trip hazards
    • exposure to hazardous substance
  • 2. Planning & Design
    • Improper design
    • poor safety planning
  • 3. Site Inspection
    • Unstable ground conditions
    • exposure to asbestos
  • 4. Assemble Equipment
    • Incorrect equipment assembly
    • manual handling injuries
  • 5. Removal Procedure
    • Falling objects
    • vibration damages
  • 6. Cutting Structural Components
    • Sparks flying
    • sharp object injuries
  • 7. Handling Removed Materials
    • Hazardous Material exposure
    • improper disposal
  • 8. Clean Up
    • Slips and trips
    • inappropriate disposal of waste
  • 9. Deconstruction plan confirmation
    • Misinterpretations of plan
    • lack of communication
  • 10. Tools & Equipment Setup
    • Inadequate tools
    • defective equipment
  • 11. Structural Component Assessment
    • Incorrect assessment
    • unnoticed damage
  • 12. Structural Component Removal
    • Heavy lifting injuries
    • structural collapse
  • 13. Segregate the components
    • Mishandling of components
    • incorrect segregation
  • 14. Load onto transport vehicle
    • Manual handling injuries
    • transport accidents
  • 15. Final Inspection
    • Overlooked damages
    • unrecognized hazards
  • 16. Sign off & Report
    • Missing sign offs
    • improper documentation
  • 17. Maintain Equipment
    • Poor maintenance practices
    • equipment breakdown
  • 18. Site Debrief
    • Lack of communication
    • misunderstandings
  • 19. Off-site transport
    • Road accidents
    • Incorrect loading procedures
  • 20. Disposal & Cleanup
    • Inadequate disposal procedures
    • environmental damage
Shopping Cart