Relocating Goods Safe Work Method Statement (SWMS)

$96.80

The Relocating Goods Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Relocating Goods Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Relocating Goods Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Relocating Goods Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Relocating Goods Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Relocating Goods Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Relocating Goods Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping hazards
    • Manual handling injuries
    • Exposure to harmful substances
  • 2. Equipment Check
    • Malfunctioning equipment
    • Inadequate training
  • 3. Loading Goods
    • Manual handling injuries
    • Falling objects
  • 4. Safe Transport
    • Vehicle accidents
    • Spillage of hazardous substances
  • 5. Unloading Goods
    • Manual handling injuries
    • Falling objects
  • 6. Storage Placement
    • Misplacement
    • Tripping hazards
  • 7. Disposal of Packaging
    • Waste management
    • Sharp objects
  • 8. Regular Inspection
    • Missed faulty equipment
    • Overlooked hazards
  • 9. Emergency Procedures
    • Lack of knowledge
    • Insufficient drills
  • 10. Reporting Procedures
    • Forgotten specifics
    • Delayed reporting
  • 11. Staff Training
    • Inadequate training
    • Lack of updated knowledge
  • 12. Equipment Maintenance
    • Faulty equipment usage
    • Negligence in maintenance
  • 13. Documentation
    • Incorrect data entry
    • Forgotten logging
  • 14. Audit and Review
    • Untimely review
    • Non-compliance
  • 15. Closure
    • Forgetfulness
    • Overlooking procedures

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Relocating Goods Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart