Relocate Power Outlets Safe Work Method Statement (SWMS)

$96.80

The Relocate Power Outlets Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Relocate Power Outlets Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Relocate Power Outlets Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Relocate Power Outlets Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Relocate Power Outlets Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Relocate Power Outlets Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Relocate Power Outlets Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Trip hazards from loose wires
    • Electrical shock from live outlets
  • 2. Assess Workplace
    • Unfamiliarity with new location
    • Incorrect placement of outlets leading to overloading
  • 3. Isolate Power Supply
    • Risk of electric shock
    • Improper isolation procedures leading to power reconnection
  • 4. Removal of Old Outlets
    • Electrical shock
    • Physical injury from use of tools
  • 5. Install New Outlets
    • Electrical short circuiting due to incorrect wiring
    • Fire hazard from poor quality materials
  • 6. Reconnect Power Supply
    • Risk of electric shock
    • Incorrect power connection causing damage to devises
  • 7. Test newly installed outlets
    • Electrocution
    • Faulty outlet
  • 8. Clean the work area
    • Slips
    • trips and falls due to left-over debris
    • Puncture or cuts from sharp objects
  • 9. Return unused material/tools
    • Dust inhalation
    • Lifting heavy items
  • 10. Document Work
    • Missed steps for future reference
    • Paperwork errors resulting in mistakes on next job
  • 11. Review works
    • Overlooked mistakes
    • Incomplete tasks
  • 12. End of Shift
    • Fatigue-related mishaps
    • Misplacement of personal belongings
  • 13. Follow up inspection
    • Damaged power outlets
    • Ineffective relocation works
  • 14. Training Staff
    • Inefficient training leading to misuse of machinery
    • Ignorance of safety procedures
  • 15. Regular Maintenance Check
    • Inadequate tools for inspection
    • Overlooked minor defects escalating to major hazards

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Relocate Power Outlets Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart