BlueSafe

Plumbing Temporary Services Connection Risk Assessment

This risk assessment covers temporary plumbing service connections, including planning, isolation, installation, testing and handover.

Activities covered include

  • Plan the connection and identify existing or concealed services
  • Install and support temporary pipework, hoses and pressure systems
  • Test, commission and hand over temporary services

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Plumbing Temporary Services Connection Risk Assessment
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This risk assessment covers temporary plumbing service connections, including planning, isolation, installation, testing and handover. It supports planning by identifying service, excavation, pressure, electrical, exposure and access hazards for risk management.

Activities & Risks Covered

This assessment addresses activities and risks including:

  • Plan the connection and identify existing or concealed services
  • Set up and maintain access around the temporary connection area
  • Isolate existing services and manage stored energy before work
  • Manage excavation or trench access for service connections
  • Handle pipes, fittings, pumps and equipment
  • Install and support temporary pipework, hoses and pressure systems
  • Manage exposure to contaminated materials, chemicals, vapours and dust
  • Work in pits, shafts and other restricted spaces
  • Route temporary services at height or over openings
  • Test, commission and hand over temporary services

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out temporary plumbing service connection activities.

Activities & Hazards Covered

Activity Potential Hazards
Planning and service identification
  • Strike on underground or concealed services including electricity, gas, water, sewer or communications
  • Incorrect assumptions about service locations, isolation points or connection details
  • Unauthorised access to the work area by workers, occupants or the public
Work area set-up and access
  • Slips, trips and falls from uneven ground, mud, hoses, leads, materials or poor housekeeping
  • Vehicle or mobile plant interaction in access ways
  • Public or other trade exposure near the temporary connection area
Isolation of existing services and stored energy
  • Electric shock, burns or arc exposure from temporary power, pumps, extension leads or nearby electrical services
  • Unexpected release of pressure, water, sewage or contaminated contents during tie-in or disconnection
  • Re-energisation or reopening of services by others during the work
Excavation or trench access for service connection
  • Trench collapse or ground failure
  • Falls into open excavations
  • Contact with underground services during excavation
  • Water ingress, unstable ground, spoil or materials loading the trench edge
Manual handling of pipes, fittings, pumps and equipment
  • Musculoskeletal strain from lifting, carrying, pushing, pulling or awkward postures
  • Pinch points and crush injuries while positioning pipes or fittings
  • Fatigue from repetitive handling in restricted spaces
Temporary pipework, hoses and pressure systems
  • Uncontrolled release from pressurised lines, hoses or fittings
  • Hose whip, fitting failure or leaks causing impact, slips or water damage
  • Inadequate support of temporary pipework causing movement or collapse
Hazardous substances and biological exposure
  • Exposure to sewage, contaminated water, sludge, mould or soil contaminants
  • Skin or eye contact with adhesives, primers, sealants, fuels or cleaning chemicals
  • Inhalation of vapours, aerosols or contaminated dust
Work in pits, shafts or other restricted spaces
  • Oxygen deficiency or hazardous atmosphere
  • Restricted access and delayed rescue
  • Slips, falls, heat stress, poor lighting and communication failure in a restricted space
Working at height or over penetrations
  • Falls from ladders, platforms, edges or through openings while routing temporary services
  • Dropped tools or materials striking persons below
  • Unstable access equipment or misuse of ladders
Testing, commissioning and handover of temporary services
  • Leaks, bursts or failure during testing or energising
  • Unexpected service interruption to occupied or live areas
  • Residual hazards left in place including open pits, temporary leads, unsupported lines or unclear status of the connection

Need to tailor this risk assessment?

Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:

  • Model guidance: Model Code of Practice: Excavation work — 2.3. Controlling the risks; p. 17.
  • Model guidance: Model Code of Practice: Managing the work environment and facilities — 2. The work environment; p. 13.
  • Model guidance: Model Code of Practice: Hazardous manual tasks — 4.1 The hierarchy of control measures; p. 31.
  • Model guidance: Model Code of Practice: Managing electrical risks in the workplace — 2.1 Identifying the hazards; p. 14.
  • Model guidance: Model Code of Practice: Confined spaces — 3.4 Assessing the risks; p. 24.
  • Model guidance: Model Code of Practice: Managing the risk of falls at workplaces — 3.2 Identifying the hazards; p. 16.
  • Model guidance: Model Code of Practice: Managing the risk of fatigue at work — Provide sufficient breaks while at work; p. 30.
  • Model guidance: Model Code of Practice: Managing risks of plant in the workplace — Plant hazard identification — Traffic movements in the workplace; p. 17.

Standard Risk Assessment Features (Click to Expand)
  • Activity-specific hazard identification and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each activity
  • Risk matrix and assessment classification
  • Review, monitoring and sign-off fields
  • Site-specific customisation before use

Suitable for Industries

Building and ConstructionPlumbing and Gasfitting