Plumbing Rough-ins And Fitouts Safe Work Method Statement (SWMS)

$79.50

The Plumbing Rough-ins And Fitouts Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Plumbing Rough-ins And Fitouts Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

“`html

Safe Work Method Statement Template for Plumbing Rough-ins And Fitouts

In the bustling world of plumbing, safety is paramount. Our Safe Work Method Statement (SWMS) Template for Plumbing Rough-ins and Fitouts is here to guide you through your projects with ease and efficiency. Designed for tradies who need a reliable framework, our template brings together the essentials of planning, safety, and compliance. Below, you’ll find key features that’ll make this a valuable tool in your trade arsenal.

  • Pre-filled and Comprehensive: We’ve covered common tasks and risks associated with plumbing rough-ins and fitouts, giving you a solid foundation to work from. Save time with pre-filled sections that outline typical hazards and control measures.
  • Fully Editable and Customisable in Microsoft Word: Flexibility is key, and that’s why our SWMS is provided in an easily editable Word format. Tailor the document to suit the specifics of your site and job requirements effortlessly.
  • Includes the Scope of the Project and the Project Details: Each job is unique, and so is your SWMS with spaces dedicated to describing the reach and particulars of your project. This ensures everyone involved knows the exact expectations.
  • Includes Checklist of Any High-Risk Machinery on Site: Recognising potential risks starts with identifying them. A checklist to document any high-risk machinery helps keep workers alert to the equipment that demands caution.
  • Includes Space for Recording Any Staff Training: Training records are not just good practice; they’re part of demonstrating compliance. Document who’s trained, their qualifications, and ensure everyone is up to date.
  • Includes Before and After Risk Ratings: Measure the effectiveness of your safety controls with before-and-after risk ratings. It’s a simple yet effective way to see how well you’re managing those job site dangers.
  • Includes Resources for Use of Legislative References: Navigate the often-complex legal waters with references that point you in the right direction. Stay informed about regulations and demonstrate adherence with confidence.
  • Includes All PPE Required: Don’t leave safety to chance. Our list outlines the Personal Protective Equipment necessary for various situations, helping ensure workers are protected against potential hazards.
  • Includes Risk Assessment and Risk Assessment Matrix: Evaluate risks like a pro with our included matrix, guiding you to systematically identify, analyse, and evaluate risks, and define controls effectively.
  • Includes a Checklist to Ensure All Requirements Have Been Covered When Implementing the SWMS: Checklists keep everything on track, making sure no step is missed in the implementation process of your Safe Work Method Statement.
  • Includes Sign Off Page for All Workers and Responsible Persons: Accountability matters. A sign-off page confirms everyone is aware of the SWMS. It offers peace of mind knowing every team member acknowledges their role in maintaining safety standards.
  • Easy to Use, Easy to Customise: Simplicity doesn’t mean less effective. Our template is intuitive, reducing the hassle of understanding complex documentation, letting you focus on completing the work required.
  • Suitable for Large Contracts and Tenders, Including Tier 1 Contractual Work: Whether you’re tackling small jobs or eyeing tier 1 contracts, this SWMS is scaled to handle projects large and small, ensuring you’re ready for whatever bid comes next.
  • Quick Delivery by Email: Getting started is fast. We deliver straight to your inbox, meaning the path to a safer work environment starts soon after purchase.

This SWMS template is designed with tradespeople in mind – practical, straightforward, and adaptable to whatever scale your project may be. Approach each task knowing you’ve got an excellent resource at your beck and call, made especially to help you operate safely and confidently.

“`


The Plumbing Rough-ins And Fitouts Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Manual handling injuries
    • slips and trips
  • 2. Site Induction
    • Lack of awareness
    • communication barriers
  • 3. Tool Check
    • Equipment failure
    • improper use of tools
  • 4. Material Handling
    • Falling objects
    • repetitive strain
  • 5. Trenching
    • Collapse
    • confined spaces
  • 6. Pipe Cutting
    • Eye injuries
    • lacerations
  • 7. Assembly
    • Incorrect assembly
    • overhead hazards
  • 8. Welding/Soldering
    • Burns
    • toxic fume exposure
  • 9. Installation
    • Electrical shock
    • ergonomic strain
  • 10. Fixing
    • Working at heights
    • tool misuse
  • 11. Pressure Testing
    • High-pressure release
    • equipment failure
  • 12. Stackwork
    • Scaffold collapse
    • falling from height
  • 13. Insulation
    • Dust inhalation
    • cuts from materials
  • 14. Quality Control
    • Lack of attention to detail
    • inadequate checks
  • 15. Clean Up
    • Sharp objects
    • slippery surfaces
  • 16. Final Inspection
    • Missed issues
    • inadequate documentation
  • 17. Handover
    • Incomplete handover
    • communication errors
  • 18. Transport
    • Vehicle accidents
    • unsecured loads

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Plumbing Rough-ins And Fitouts Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart