BlueSafe
Plumbing Drainage and Gas Fitting SWMS

Plumbing Drainage and Gas Fitting SWMS

  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content – Ready to Deploy Immediately
  • Customisable – Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Plumbing Drainage and Gas Fitting SWMS

Product Overview

This Plumbing Drainage and Gas Fitting SWMS is a site-ready Safe Work Method Statement designed to identify hazards, assess risks, and implement effective controls for plumbing, drainage and gas installation work. It is a comprehensive document that supports WHS compliance and manages risks across multiple aspects of plumbing drainage and gas fitting activities on Australian worksites.

Activities & Specific Tasks Covered

This document includes specific risk controls for:

  • Planning and preparation of plumbing, drainage and gas fitting works, including site assessment and service locating
  • Selection, inspection and safe use of hand tools, power tools and portable equipment used in plumbing and gas work
  • Excavation for drainage trenches, pits and pipework, including shoring, benching and protection from ground collapse
  • Manual handling of pipes, fittings, cylinders and fixtures, with controls to minimise musculoskeletal injuries
  • Installation, connection and testing of water supply and sanitary plumbing systems
  • Installation, pressure testing and commissioning of gas fitting systems, appliances and associated pipework
  • Control of gas-related hazards including leaks, ignition sources, ventilation and atmospheric monitoring where required
  • Working in and around confined or restricted spaces such as pits, crawl spaces, ceiling cavities and service ducts
  • Use of ladders, platforms and temporary access equipment for work at low heights in ceiling spaces and on walls
  • Hot work activities such as soldering, brazing and cutting, including fire prevention and hot work permits where applicable
  • Isolation, lock-out and tagging of water, gas and electrical services prior to commencing work
  • Management of wastewater, contaminated materials, spoil and general plumbing waste in an environmentally responsible manner
  • Traffic and pedestrian management when working in driveways, footpaths, roadways or shared access areas
  • Emergency response procedures for gas leaks, fire, personal injury and exposure to hazardous substances

Who is this for?

This SWMS is designed for licensed plumbers, drainage contractors, gas fitters, maintenance plumbers, plumbing apprentices, and site supervisors coordinating plumbing, drainage and gas fitting works on residential, commercial or civil sites.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
1. Site Preparation
  • Exposure to hazardous substances, Trip hazards
2. Equipment Setup
  • Electric shock, Equipment malfunction
3. Pipe Installation
  • Manual handling injuries, Falling objects
4. System Configuration
  • Incorrect installation, Leakages
5. Pressure Testing
  • Burst pipes, Equipment failure
6. Welding and Joining
  • Burns, Inhalation of fumes
7. Excavation
  • Collapse of trenches, Striking underground utilities
8. Laying Pipes
  • Manual handling injuries, Exposure to contaminants
9. Gas Fitting
  • Gas leaks, Fire hazard
10. Sealant Application
  • Chemical exposure, Inadequate ventilation
11. Final Inspection
  • Overlooking defects, Non-compliance with standards
12. Cleanup
  • Sharp objects, Slippery surfaces
13. Waste Disposal
  • Inappropriate disposal methods, Hazardous waste exposure
14. Documentation
  • Data mismanagement, Loss of documents
15. Customer Handover
  • Miscommunication, Unresolved issues
16. Emergency Response Training
  • Lack of awareness, Delay in action
17. Tool Maintenance
  • Tool malfunctions, Injuries from defective tools
18. Gas Detection Testing
  • Inadequate detection, False alarms
19. Compliance Audit
  • Regulatory fines, Reputational damage
20. Debriefing Session
  • Incomplete feedback, Lack of improvement strategies
Various hazards managed

Need to add specific site requirements?

Don't worry if a specific job step isn't listed above. Once you purchase, simply log in to your Client Portal and add your own custom job steps at no extra cost. We take care of the hard work—creating the hazards and control measures for free—to ensure your document is compliant within minutes.

Legislation & References

This document was researched and developed to align with:

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2017
  • Safe Work Australia – Managing the Risk of Falls at Workplaces Code of Practice: Guidance on safe systems of work when using ladders and working at low heights
  • Safe Work Australia – Confined Spaces Code of Practice: Requirements for risk assessment, entry permits and controls when working in pits, shafts and other confined spaces
  • Safe Work Australia – Hazardous Manual Tasks Code of Practice: Controls to reduce the risk of musculoskeletal disorders from lifting and handling pipes, fittings and equipment
  • Safe Work Australia – Managing Noise and Preventing Hearing Loss at Work Code of Practice: Guidance for controlling noise exposure from power tools and machinery
  • Safe Work Australia – Managing the Risk of Hazardous Chemicals in the Workplace Code of Practice: Applicable to the handling and storage of gas cylinders, solvents, sealants and other chemicals
  • Safe Work Australia – Excavation Work Code of Practice: Requirements for safe excavation of trenches and pits for drainage and services
  • AS/NZS 5601 Gas Installations: Requirements for the safe design, installation and commissioning of gas fitting systems and appliances
  • AS/NZS 3500 Plumbing and Drainage: Technical provisions for the safe installation of plumbing and drainage systems

Standard SWMS Features (Click to Expand)
  • Operational guidelines, with a step-by-step approach to safe work
  • Possible hazards that may be encountered
  • Step-by-step safety procedures to follow
  • Before work starts – Guidelines and Checks
  • Safety measures and guides
  • Operational Safety Checks
  • Before and After Risk Ratings
  • Risk Assessment Matrix
  • High Risk Work Involved
  • Emergency Evacuation Procedure
  • Plant and Equipment
  • Qualifications and Permits
  • Specific Personal Protective Equipment (PPE)
  • Company Personnel Sign-off form

$96.8

Safe Work Australia Aligned