BlueSafe
Pipeline Pressure Testing SWMS

Pipeline Pressure Testing SWMS

  • -100% Compliant with Australian WHS Acts & Regulations
  • -Fully Editable MS Word & PDF Formats Included
  • -Pre-filled Content - Ready to Deploy Immediately
  • -Customisable - Easily Add Your Logo & Site Details
  • -Includes 2 Years of Free Compliance Updates

Included with your purchase

1Download immediately

Sign in to Blue Safe Portal and download the editable Word or PDF files.

2Optional free branding

Complete your company profile first if you want us to add your logo, business details and ABN.

One-time purchase. Portal downloads, branding and updates are included for 2 years.

Product Overview

This SWMS covers planning pipeline pressure testing, establishing exclusion zones, isolating and testing the pipeline, depressurising, rectifying defects and sign-off. It supports planning and managing risks from stored pressure, line or fitting failure, hose movement, water discharge, plant and unauthorised access.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Review the test scope
  • Establish a test exclusion zone
  • Isolate and prove the pipeline
  • Position plant and test equipment
  • Inspect hoses, fittings and test components
  • Fill and vent the pipeline
  • Pressurise the test section
  • Hold pressure and inspect the test
  • Depressurise and drain the pipeline
  • Rectify defects and retest
  • Demobilise and sign off

Who is this for?

For contractors, workers, supervisors and businesses carrying out pipeline pressure testing.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Review test scope
  • Incorrect test pressure
  • Unidentified energy sources
  • Incompatible test medium
  • Unauthorised changes
Establish test exclusion zone
  • Line rupture
  • Flying test fittings
  • Unauthorised entry
  • Vehicle intrusion
Isolate and prove pipeline
  • Unexpected pressurisation
  • Residual pressure release
  • Product exposure
  • Electrical shock
Position plant and equipment
  • Plant strike
  • Hose damage
  • Manual handling injury
  • Fuel or oil spill
Inspect test components
  • Failed hose or fitting
  • Gauge inaccuracy
  • Over-pressurisation
  • Projectile release
Fill and vent pipeline
  • Trapped air
  • Water hammer
  • Uncontrolled discharge
  • Slips from water
Pressurise test section
  • Catastrophic pipe failure
  • Hose whip
  • Flying debris
  • Noise from rupture
  • Stored energy release
Hold and inspect test
  • Delayed rupture
  • Leak spray
  • Pressure loss
  • Unauthorised access
Depressurise and drain
  • Rapid pressure release
  • Water jetting
  • Environmental contamination
  • Slip hazards
Rectify defects and retest
  • Unexpected residual pressure
  • Hot work ignition
  • Incorrect repair
  • Repeat failure
Demobilise and sign off
  • Manual handling injury
  • Residual trip hazards
  • Uncontrolled waste
  • Premature return to service

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, consult workers, provide safe plant, control hazardous chemicals, manage construction work and prepare SWMS where high-risk construction work is involved.
  • Model Code of Practice: How to Manage Work Health and Safety Risks; use as guidance only where adopted or approved in the relevant jurisdiction. The risk-management process includes identifying hazards, assessing risk where needed, applying controls and reviewing controls.
  • Model Code of Practice: Managing the Risks of Plant in the Workplace; use as guidance only where adopted or approved in the relevant jurisdiction.
  • Model Code of Practice: Construction Work; use as guidance only where adopted or approved in the relevant jurisdiction.
  • Model Code of Practice: Managing Noise and Preventing Hearing Loss at Work; the referenced exposure standard is LAeq,8h 85 dB(A) or LC,peak 140 dB(C).
  • AS 2885 series, Pipelines—Gas and liquid petroleum; AS 4041, Pressure piping; AS/NZS 3788, Pressure equipment—In-service inspection; AS 1319, Safety signs for the occupational environment; AS 1345, Identification of the contents of pipes, conduits and ducts.
  • Apply the pipeline owner’s approved engineering drawings, test specification, isolation standard and manufacturer instructions. Model WHS laws and model Codes do not automatically have legal effect in every Australian jurisdiction.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Plumbing and Gasfitting

$96.80

Safe Work Australia Aligned