Product Description: Safe Work Method Statement Template for Pipe Notcher
- Pre-filled and Comprehensive: This is a complete, detailed guide to operating pipe notchers in a safe manner. It is filled with the necessary data that’s ideal for various situations at worksites, making it comprehensive.
- Fully Editable and Customisable in Microsoft Word Format: You can make changes to the template using Microsoft Word, thereby tailoring it towards your work requirements or specific project necessities.
- Includes the Scope of the Project and the Project Details: There is adequate space for you to supply detailed information regarding project scope and additional specifics.
- Includes Checklist of Any High-risk Machinery on Site: The template allows keeping track of potentially hazardous equipment on-site, prompting precautionary measures.
- Includes Space for Recording Any Staff Training: Record any training your staff undergoes to ensure everyone on your team understands how to deal safely with machinery on site.
- Includes Before and After Risk Ratings: The SWMS identifies and rates risks before starting work and re-assesses them after the control measures have been implemented, showing the reduction in risk levels.
- Includes Resources for Use of Legislative References: Stay informed and compliant with referring legislation straight from within the document.
- Includes All PPE Required: Get a quick review of all protective gear needed to carry out activities securely. Stay shielded from avoidable mishaps!
- Includes Risk Assessment and Risk Assessment Matrix: Evaluate the level of danger each activity might involve using our risk assessment matrices, facilitating effective hazard control.
- Includes Checklist to Ensure All Requirements Have Been Covered When Implementing SWMS: A built-in checklist to confirm all aspects of your job’s safety have been thought out and strategised. Stay covered, stay safe!
- Includes Sign Off Page for All Workers and Responsible Persons: Contains a dedicated section for worker and manager endorsements following the implementation and understanding of this SWMS.
- Easy to Use, Easy to Customise: This template is designed with user-friendliness in mind – it’s hassle-free to navigate as well as customise.
- Suitable for Large Contracts and Tenders, including Tier 1 Contractual Work: Whether you’re bidding on a huge project or involved in tier 1 contractual work, our template has got you covered.
- Quick Delivery by Email: Once purchased, the SWMS template will be delivered to your provided email address promptly, so no waiting around!
The Pipe Notcher Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Slips
- trips and falls
- manual handling injuries
- 2. Transporting materials
- Road Traffic Accidents
- equipment damage
- 3. Unpacking & Checking
- Injury from incorrect storage
- manual handling injuries
- 4. Assembling pipe notcher
- Sharp or blunt trauma
- moved suddenly by another person
- 5. Pre-inspection
- Electric shock,burns
- 6. Operational check
- Equipment failure
- injury from faulty equipment
- 7.Pipe Notching
- Dust exposure,noise exposure,vibration
- 8. Cleaning up
- Slips
- trips due to untidy work area
- 9. Maintenance work
- Injuries during maintenance
- equipment failure
- 10. Removing waste materials
- Disposal of hazardous waste
- physical injuries during disposal
- 11. Dismantling process
- Falls from height,dropped objects
- 12. Loading for transport
- Manual handling injuries
- load shift in transit
- 13. Storing the pipe notcher
- Incorrect storage leading to damage
- difficulty accessing equipment for future use
- 14. Final inspection
- Missed defects leading to future safety issues
- 15. Documentation update
- Incorrect records leading to compliance issues
- 16. Training new staff members
- Improper training leading to accidents
- slow work operation
- 17. Inspection of safety gear
- Inadequate PPE leading to exposure to hazards
- 18. Updating SWMS as necessary
- Outdated SWMS
- non-compliance with WHS regulations
- 19. Undertake ongoing risk assessments
- Failure to identify new hazards
- lack of risk control measures
- 20. Discussion on safety concerns with staff
- Missed communication leading to accidents
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Pipe Notcher Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


