Physical Load Handling Risk Assessment

$79.50

The Physical Load Handling Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Physical Load Handling Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The Physical Load Handling Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • Mishandling tools
    • Incorrect storage of heavy items
  • 2. Equipment assessment
    • Faulty equipment
    • Inadequate safety measures
  • 3. Load lifting
    • Inappropriate lifting techniques
    • Overexertion
  • 4. Load carrying
    • Slippery surface
    • Obstacles in pathway
  • 5. Load placement
    • Incorrect positioning
    • Mishandling of item
  • 6. Use of lifting aids
    • Faulty machinery
    • Inadequate training
  • 7. Breakdown of carrying items
    • Inappropriate disposal
    • Faulty machinery
  • 8. Team lifting
    • Poor communication
    • Overexertion
  • 9. Training on correct lifting techniques
    • Insufficient training
    • Non-compliance to procedures
  • 10. Machine operation
    • Faulty machine
    • Lack of safety precautions
  • 11. Dealing with hazardous items
    • Exposure to harmful substances
    • Improper handling
  • 12. Reporting and rectifying unsafe practices
    • Non-compliance to reporting systems
    • Delay in rectification
  • 13. Regular inspection and maintenance
    • Unidentified hazards
    • Delays in maintenance schedule
  • 14. Adequate lighting and ventilation
    • Poor visibility
    • insufficient ventilation
  • 15. Providing personal protective equipment(PPE)
    • Non-compliance in wearing PPE
    • Damaged or faulty PPE
  • 16. Regular monitoring of health status
    • Skip mandatory health checkups
    • Inadequate first-aid
  • 17. Regular breaks and rest
    • Inadequate rest
    • Overexertion
  • 18. Emergency evacuation procedure
    • Poor understanding of emergency exits
    • Non-compliance to procedures
  • 19. Safe work procedures audit
    • Non-compliance with safety measures
    • On-site accidents
  • 20. Completion and clean up
    • Improper disposal of waste
    • Mismanagement of tools
Shopping Cart