General Light Vehicle and Company Car Driving SWMS

This SWMS covers general light vehicle and company car driving, including journey planning, vehicle checks, loading, driving, fatigue management and parking.
Activities covered include
- Plan journeys and work schedules
- Drive in normal traffic
- Manage fatigue, park, secure and report
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This SWMS covers general light vehicle and company car driving, including journey planning, vehicle checks, loading, driving, fatigue management and parking. It supports work planning and risk management by addressing road, vehicle, weather, load and driver-related hazards.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan journeys and work schedules
- Confirm licence requirements and local rules
- Complete vehicle pre-start inspections
- Set the cabin and driving position
- Load equipment and passengers
- Enter and exit the vehicle safely
- Drive in normal traffic
- Navigate intersections and overtaking
- Manage narrow spaces and reversing
- Drive through roadworks and sites
- Respond to weather and poor visibility
- Manage fatigue, park, secure and report
Who is this for?
For contractors, workers, supervisors and businesses using light vehicles or company cars for work travel.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan journey and work schedule |
|
| Confirm licence and local rules |
|
| Complete vehicle pre-start inspection |
|
| Set cabin and driving position |
|
| Load equipment and passengers |
|
| Enter and exit safely |
|
| Drive in normal traffic |
|
| Navigate intersections and overtaking |
|
| Manage narrow spaces and reversing |
|
| Drive through roadworks and sites |
|
| Respond to weather and poor visibility |
|
| Manage fatigue and safety stops |
|
| Park, secure and report |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Applicable state or territory road traffic, road rules, vehicle-registration and driver-licensing legislation.
- Model Code of Practice: How to manage work health and safety risks.
- Model Code of Practice: Managing the work environment and facilities.
- Model Code of Practice: Managing the risk of fatigue at work.
- Model Code of Practice: Managing psychosocial hazards at work.
- Model Code of Practice: Construction work, where driving is undertaken as part of construction work.
- AS/NZS 4602.1 High visibility safety garments for professional use.
- AS/NZS 2210.3 Personal protective equipment—Safety footwear.
- AS/NZS 1337.1 Personal eye-protection.
- AS/NZS 1906.1 Retroreflective materials and devices for road traffic control purposes.
- Austroads Assessing Fitness to Drive, current edition.
- Model Codes of Practice are guidance and have legal effect only where adopted or approved in the relevant jurisdiction.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes free branding + 2 years of free updates
$79.50
$96.80
Free branding + 2 years of updates