BlueSafe
Pedestal Drill SWMS

Pedestal Drill SWMS

  • -100% Compliant with Australian WHS Acts & Regulations
  • -Fully Editable MS Word & PDF Formats Included
  • -Pre-filled Content - Ready to Deploy Immediately
  • -Customisable - Easily Add Your Logo & Site Details
  • -Includes 2 Years of Free Compliance Updates

Included with your purchase

1Download immediately

Sign in to Blue Safe Portal and download the editable Word or PDF files.

2Optional free branding

Complete your company profile first if you want us to add your logo, business details and ABN.

One-time purchase. Portal downloads, branding and updates are included for 2 years.

Product Overview

This SWMS covers planning, setting up and operating a pedestal drill, from selecting tooling to drilling and clearing swarf. It supports work planning and risk management for rotating parts, workpiece movement, sharp swarf, electrical hazards and equipment faults.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Review the task and workpiece
  • Prepare and control the work area
  • Inspect the drill before use
  • Select drill bits and tooling
  • Set drill speed and position
  • Secure the workpiece and fixture
  • Complete pre-drilling checks
  • Drill and manage breakthrough
  • Clear swarf and inspect holes
  • Change tooling, manage jams and shut down
  • Report defects and sign off

Who is this for?

For contractors, workers, supervisors and businesses carrying out pedestal drilling activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Review task and workpiece
  • Incorrect drilling method
  • Unsuitable material
  • Sharp workpiece edges
  • Unplanned silica dust
Prepare work area
  • Slips and trips
  • Unauthorised access
  • Poor lighting
  • Contact with adjacent workers
Inspect drill before use
  • Entanglement in rotating parts
  • Electric shock
  • Guard failure
  • Unexpected start-up
  • Broken tooling
Select drill bit and tooling
  • Bit fracture
  • Ejected tooling
  • Excessive cutting force
  • Hand cuts from tooling
Set speed and drill position
  • Entanglement with belts
  • Unexpected spindle movement
  • Bit breakage
  • Incorrect spindle speed
Secure workpiece and fixture
  • Workpiece spin-out
  • Crush injuries
  • Ejected workpiece
  • Pinch points
  • Hand contact with drill bit
Conduct pre-drilling check
  • Entanglement
  • Flying particles
  • Noise exposure
  • Inadequate guarding
  • Loose clothing
Drill workpiece
  • Entanglement in rotating spindle
  • Contact with drill bit
  • Flying swarf
  • Bit breakage
  • Workpiece ejection
  • Hot metal
Complete breakthrough safely
  • Sudden bit grab
  • Workpiece spin-out
  • Ejected burrs
  • Bit fracture
  • Hand contact with rotating bit
Clear swarf and inspect holes
  • Cuts from sharp swarf
  • Entanglement
  • Hot swarf
  • Eye injury
  • Slip hazards
Change tooling or adjust
  • Unexpected start-up
  • Entanglement
  • Falling drill bit
  • Hand injuries
  • Stored mechanical energy
Manage jams and emergencies
  • Unexpected rotation
  • Electric shock
  • Entanglement injury
  • Broken tooling
  • Fire from electrical fault
Shut down and clean area
  • Residual rotation
  • Sharp swarf
  • Slips from coolant
  • Manual handling strain
Report defects and sign off
  • Reuse of defective plant
  • Incomplete maintenance records
  • Uncontrolled residual hazards

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations: duties to provide and maintain safe plant, manage risks, provide information, training, instruction and supervision, maintain workplaces and manage hazardous chemicals.
  • Model Code of Practice: Managing the Risks of Plant in the Workplace — guidance on the hierarchy of control, guarding, worker training, inspection, maintenance and plant records.
  • Model Code of Practice: How to Manage Work Health and Safety Risks — guidance on identifying hazards, consulting workers and applying the hierarchy of controls.
  • AS 4024 series, Safety of machinery — guidance for machinery safeguarding and risk reduction.
  • ISO 12100:2010, Safety of machinery — general principles for risk assessment and risk reduction.
  • AS/NZS 3760, In-service safety inspection and testing of electrical equipment — guidance for electrical equipment inspection and testing.
  • AS/NZS 1337.1, Personal eye-protection for industrial applications; AS/NZS 1270, Acoustics—Hearing protectors; AS/NZS 2210.3, Personal protective equipment—Safety footwear.
  • Model WHS laws and model Codes of Practice are guidance and should be checked against the legislation, regulations, approved codes and regulator advice applying in the relevant jurisdiction.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Metal Fabrication and Welding

$96.80

Safe Work Australia Aligned