Oxy and Acet Soldering Safe Work Method Statement (SWMS)

$96.80

The Oxy and Acet Soldering Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Oxy and Acet Soldering Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

“`html

Safe Work Method Statement Template for Oxy and Acet Soldering

If you’re looking to ensure the safety of your team while working with oxy-acetylene soldering, our Safe Work Method Statement (SWMS) template can be a valuable tool. Here’s why:

  • Pre-filled and Comprehensive: Our SWMS template comes pre-filled with all the essential details required for oxy-acetylene soldering tasks. This means you get a thorough starting point that saves time and covers key areas for better safety practices.
  • Fully editable and customisable in Microsoft Word format for easy editing: This template is provided in Microsoft Word format, making it incredibly simple to edit and customise as per your specific project needs. Tailor the content to fit your operational requirements without hassle.
  • Includes the scope of the project and the project details: Clearly defines the extent of work and project specifics. This helps in outlining what needs doing, who will do it, and how it will be done. Properly scoped projects reduce misunderstandings and increase efficiency.
  • Includes checklist of any high risk machinery on site: To enhance safety, our template includes a detailed checklist for any high-risk machinery present on-site. This ensures that all significant hazards are identified and managed appropriately.
  • Includes space for recording any staff training: Keep track of staff training effortlessly. The template provides dedicated space for documenting the necessary training courses attended by the employees, ensuring everyone is adequately prepared for the job.
  • Includes before and after risk ratings: Evaluates risks both before and after implementing safety measures. This double-tiered approach helps you understand the effectiveness of your safety interventions and make adjustments where needed.
  • Includes resources for use of legislative references: Provides resources to reference relevant legislation and standards. This helps ensure your work complies with Australian laws and guidelines, keeping your operations lawful and up-to-date.
  • Includes all PPE required: Lists all Personal Protective Equipment (PPE) necessary for the job. Proper PPE reduces the chance of injury, safeguarding your team while they perform their duties.
  • Includes risk assessment and risk assessment matrix: Comes with a comprehensive risk assessment framework and matrix. This assists in identifying, evaluating, and prioritising risks efficiently, making it simpler to manage safety on-site.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: Features a practical checklist to confirm that all steps have been followed correctly when putting the SWMS into action. This helps maintain thoroughness and avoid overlooking crucial elements.
  • Includes sign off page for all workers and responsible persons: A sign-off section ensures that everyone involved acknowledges their understanding and acceptance of the SWMS. It’s an effective way to promote accountability and communication within the team.
  • Easy to use, easy to customise: Designed with simplicity in mind, our template is straightforward to use and modify. Its user-friendly layout is ideal for tradespeople who need to focus on getting the job done safely and efficiently.
  • Suitable for large contracts and Tenders, including tier 1 contractual work: Whether it’s a massive contract or tier-1 tender, this template scales well to meet various project demands. It’s robust enough to support complex operations without missing critical points.
  • Quick delivery by email: We know time is vital, so we offer quick digital delivery. Get your SWMS template straight to your inbox, ready for immediate use.

By integrating these features into your safety planning, you can foster a safer work environment and show a strong commitment to workplace health and safety.

“`


The Oxy and Acet Soldering Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Fire hazards from gas leaks
    • burn injuries
  • 2. Inspect Equipment
    • Faulty equipment
    • gas leaks
  • 3. Set Up Work Area
    • Tripping hazards
    • insufficient ventilation
  • 4. Secure Gas Cylinders
    • Cylinder falls
    • gas leaks
  • 5. Connect Regulators
    • Incorrect connections
    • gas leaks
  • 6. Conduct Leak Test
    • Inadequate testing
    • gas exposure
  • 7. Adjust Pressure
    • Over-pressurisation
    • regulator failure
  • 8. Ignition
    • Flashback
    • unexpected flames
  • 9. Heat Joint
    • Burns
    • fumes inhalation
  • 10. Apply Solder
    • Burns
    • falling solder
  • 11. Monitor Temperatures
    • Overheating
    • fire risks
  • 12. Cool Down Process
    • Rapid cooling causing cracks
    • burns
  • 13. Shut Down Procedure
    • Residual gas release
    • incorrect shut down
  • 14. Disconnect Equipment
    • Gas leaks during disconnection
    • manual handling injuries
  • 15. Clean Up Work Area
    • Cuts from sharp instruments
    • tripping hazards
  • 16. Store Equipment
    • Improper storage leading to damage
    • tripping hazards
  • 17. Dispose of Waste
    • Chemical exposure
    • incorrect disposal methods
  • 18. PPE Verification
    • Inadequate PPE
    • damaged PPE
  • 19. Check Environment
    • Environmental hazards
    • inadequate lighting
  • 20. Report Completion
    • Missed safety steps
    • incomplete documentation

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Oxy and Acet Soldering Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart