BlueSafe
Mobile Crane Operation SWMS

Mobile Crane Operation SWMS

  • -100% Compliant with Australian WHS Acts & Regulations
  • -Fully Editable MS Word & PDF Formats Included
  • -Pre-filled Content - Ready to Deploy Immediately
  • -Customisable - Easily Add Your Logo & Site Details
  • -Includes 2 Years of Free Compliance Updates

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Product Overview

This SWMS covers mobile crane operations, from lift planning and site setup through to load handling, special lifts, emergency response and demobilisation. It supports planning and managing risks associated with crane stability, loads, access, powerlines, people and changing site conditions.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan lifting operations and load paths
  • Arrive at and access the site safely
  • Establish work boundaries and control entry
  • Inspect the crane and access arrangements
  • Position the crane and deploy outriggers
  • Configure the crane for the planned lift
  • Sling and secure loads
  • Conduct a test lift
  • Lift and place materials
  • Manage blind lifts and communication
  • Perform pick-and-carry and special lifts
  • Respond to emergencies and demobilise the crane

Who is this for?

Suitable for contractors, workers, supervisors and businesses involved in mobile crane operations and lifting activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan lifting operations
  • Incorrect crane selection
  • Crane overload
  • Ground failure
  • Powerline contact
  • Unplanned load path
  • Poor communication
Arrive and access site
  • Vehicle collision
  • Pedestrian strike
  • Overhead strike
  • Crane roll-over
  • Unsecured boom
  • Traffic conflict
Establish work boundaries
  • Unauthorised entry
  • Crush by counterweight
  • Suspended-load strike
  • Plant collision
  • Falling objects
  • Public exposure
Inspect crane and access
  • Mechanical failure
  • Hydraulic leak
  • Fall while climbing
  • Cabin slip
  • Fire
  • Defective safety devices
Position and deploy outriggers
  • Crane overturning
  • Outrigger sinkage
  • Underground service damage
  • Excavation collapse
  • Crush by stabilisers
  • Uneven ground
Configure crane safely
  • Incorrect counterweight
  • Boom failure
  • Overload indicator error
  • Boom contact
  • Dropped counterweight
  • Crane instability
Sling and secure loads
  • Lifting gear failure
  • Dropped load
  • Load imbalance
  • Sharp-edge sling damage
  • Crush during connection
  • Incorrect lifting point
Conduct test lift
  • Unexpected overload
  • Brake failure
  • Load shift
  • Crane instability
  • Outrigger settlement
  • Load swing
Lift and place materials
  • Crush from swinging load
  • Dropped objects
  • Overloading
  • Collision with structure
  • Wind loading
  • Suspended-load fall
Manage blind lifts
  • Loss of communication
  • Structure strike
  • Powerline contact
  • Load collision
  • Dogger exposure
  • Uncontrolled movement
Perform pick and carry
  • Crane roll-over
  • Load swing
  • Pedestrian strike
  • Tyre failure
  • Ground collapse
  • Overhead strike
Complete special lifts
  • Concrete kibble discharge
  • Water load instability
  • Tandem lift overload
  • Obstructed load release
  • Dropped load
  • Crane collision
Respond to emergencies
  • Crane electrical contact
  • Load drop
  • Fire
  • Medical emergency
  • Emergency descent
  • Crane instability
Maintain and demobilise crane
  • Unexpected movement
  • Stored hydraulic energy
  • Dropped counterweight
  • Transport collision
  • Oil spill
  • Defective plant reuse

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, provide safe plant, consult, train, supervise and control high-risk construction work.
  • Model Code of Practice: Managing the Risks of Plant in the Workplace.
  • Mobile Crane Code of Practice 2024, used as guidance for crane selection, planning, stability, ground support, wind, exclusion zones, erection, dismantling, inspection and maintenance.
  • Model Code of Practice: Work near Overhead and Underground Electric Lines, used as guidance for elimination, approach-distance planning, barriers and motion-limiting controls.
  • AS 1418.5 Cranes, hoists and winches—Mobile cranes; AS 2550.1 Cranes, hoists and winches—Safe use—General requirements; AS 2550.5 Cranes, hoists and winches—Safe use—Mobile cranes.
  • AS 1418.1 Cranes, hoists and winches—General requirements; AS 4991 Lifting devices; AS 3775 Chain slings—Grade T; AS 1353 Flat synthetic-webbing slings; AS 4497 Roundslings; AS 2741 Shackles.
  • Use model laws, model Codes and technical standards as guidance only; confirm the legislation, regulator requirements and adopted code status in the state or territory where work is undertaken.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionTransport and LogisticsWarehousing and DistributionCivil Construction and EarthworksDemolitionMining and Resources

Related templates

$79.50

$96.80

Save $17.30
Safe Work Australia Aligned