Introducing our Safe Work Method Statement Template specifically designed for an Order Picker Forklift, outfitted with key features that ensure both compliance and efficiency on your construction site.
- Pre-filled and Comprehensive: We’ve done the hard yards for you by pre-filling out vital sections, ensuring this document is comprehensive and includes rigorous checks on safety aspects.
- Fully editable and customisable in Microsoft Word format for easy editing: Need specifics altered? Not a problem! This document is fully customisable to align perfectly with your project details and requirements.
- Includes the scope of the project and the project details: This ensures management, staff, and contractors are informed and aligned throughout the project’s duration, therefore maintaining high levels of safety.
- Includes checklist of any high-risk machinery on site: To assist with risk reduction, a comprehensive checklist for potential high-risk machinery is included. Through diligent use, workers can preemptively address these risks before incidents occur.
- Includes space for recording any staff training: Record all necessary staff training relating to safe work practices and operating procedures, playing a pivotal role in preserving robust health and safety standards within your workplace.
- Includes before and after risk ratings: Understand the effectiveness of your mitigation measures by comparing risk ratings before and after.
- Includes resources for use of legislative references: This ensures you have access to relevant laws, guidelines and regulations corresponding to your workplace and industry, assisting you remain compliant.
- Includes all PPE required: Our template clearly outlines all necessary personal protective equipment (PPE), ensuring workers are thoroughly protected when on site.
- Includes risk assessment and risk assessment matrix: Mitigation of risks is essential, our SWMS includes both a thorough risk assessment and a risk assessment matrix to assist in this endeavour.
- Includes a checklist to ensure all requirements have been covered when implementing the SWMS: Never miss important safety measures with our comprehensive checklist making certain all SWMS requirements are met.
- Includes sign-off page for all workers and responsible persons: Accountability matters; our template’s sign-off page ensures all relevant parties read, comprehend, and agree to adhere to all safety protocol outlined in the document.
- Easy to use, easy to customise: No need for extensive technical knowledge – just follow our straightforward guidelines.
- Suitable for large contracts and Tenders, including tier 1 contractual work: Whether your project is big or small, our template is designed to cater to all, from single projects to large contracts and high-profile tier 1 operations.
- Quick delivery by email: We understand you’re keen to get started; that’s why as soon as you’ve got your template, we send it directly to your nominated email address without delay.
Just remember, while we’ve done our darndest to provide you with an efficient tool to create your SWMS, ultimate success lies in how well you use and implement it within your teams and worksite. Stay safe, mates!
The Order Picker Forklift Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Struck by moving vehicle
- Injuries from pre-use checks
- 2. Pre-Operation Inspection
- Forklift falls whilst elevated
- Unexpected starting of machine
- 3. Mounting and Dismounting
- Slips
- trips and falls
- Injury from improper mounting/dismounting
- 4. Starting and Stopping
- Vehicle runaway
- Reversing and sight lines
- 5. Operation (General)
- Collision with pedestrians
- Fall of load
- 6. Load Handling
- Overturning
- Crush injuries
- 7. Driving on slopes
- Rollover
- Loss of load
- 8. Parking
- Unauthorised access
- Unintended vehicle movement
- 9. Working at Heights
- Falls from height
- Falling objects
- 10. Lowering the Forks
- Foot injuries
- Tip over
- 11. Post-operation Checks
- Fire Hazard from leaking fuels
- Battery acid leaks
- 12. Tilt Operations
- Load shift
- Truck tip-over
- 13. Fork Adjustments
- Struck by forks
- Uncontrolled horizontal movements
- 14. Refuelling/Recharging
- Fire/explosion
- Electric shocks
- 15. Emergency Situations
- Panic reactions leading to injuries
- Ineffective response to emergencies
- 16. Maintenance & Repair
- Electrical faults causing fire/shocks
- Injuries from incorrect repair procedures
- 17. Pedestrian Safety
- Pedestrian collision
- Falls into path of operating trucks
- 18. Manual Handling
- Musculoskeletal Disorders
- Crush injuries from load handling
- 19. Noise Exposure
- Loss of hearing
- Distraction leading to other hazards
- 20. Working in Environmental Conditions
- Heat stress
- Inadequate lighting
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Order Picker Forklift Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


