Overhead Gantry and Jib Crane SWMS

This SWMS covers overhead gantry and jib crane activities, including lift planning, equipment inspection, slinging, load movement, fault clearing and handover.
Activities covered include
- Plan the lift and assess the work
- Operate jib and pedestal cranes
- Shut down equipment and complete handover
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This SWMS covers overhead gantry and jib crane activities, including lift planning, equipment inspection, slinging, load movement, fault clearing and handover. It supports planning for load stability, lifting gear, overhead travel, exclusion areas and interactions around suspended loads.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the lift and assess the work
- Set up and control the work area
- Inspect crane controls and lifting gear
- Sling and secure loads
- Operate bridge gantry cranes
- Operate jib and pedestal cranes
- Transport loads overhead
- Use electromagnets, grabs and loading platforms
- Maintain equipment and clear faults
- Land loads and disconnect lifting gear
- Shut down equipment and complete handover
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out overhead gantry and jib crane activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan work and assess lift |
|
| Set up work area |
|
| Inspect crane and controls |
|
| Inspect lifting gear |
|
| Sling and secure load |
|
| Operate bridge gantry crane |
|
| Operate jib and pedestal crane |
|
| Transport overhead loads |
|
| Use electromagnets and grabs |
|
| Use cantilevered loading platform |
|
| Maintain and clear faults |
|
| Land load and disconnect |
|
| Shutdown and handover |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: Managing the Risks of Plant in the Workplace (November 2024), including controls for suitable lifting attachments, safe working limits, controlled loads and preventing loads travelling over people.
- Model Code of Practice: Construction Work (November 2024), where this work forms part of construction work or includes high-risk construction work.
- Model Code of Practice: Managing the Risks of Falls at Workplaces, where elevated crane, runway, jib or platform access is required.
- Model Code of Practice: Work near Overhead and Underground Electric Lines, where crane travel, loads or lifting gear could approach electrical lines.
- Model Code of Practice: Hazardous Manual Tasks, noting overhead travelling, gantry and jib cranes may reduce manual-handling forces.
- AS 1418 series, including AS 1418.3 for bridge and gantry cranes and hoists; AS 2550 series for safe use of cranes; AS 4991 Lifting devices; AS 2759 Steel wire rope—Use, operation and maintenance; AS 3775.2 Chain slings—Grade T—Care and use; AS 1353.2 Flat synthetic-webbing slings—Care and use; and AS 4497.2 Round slings—Synthetic fibre—Care and use.
- Australian Standards and model Codes are guidance unless adopted, approved or otherwise given legal effect by the applicable jurisdiction, contract or regulator.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes free branding + 2 years of free updates
$79.50
$96.80
Free branding + 2 years of updates