Operate A Lathe Machine Safe Work Method Statement (SWMS)

$96.80

The Operate A Lathe Machine Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Operate A Lathe Machine Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

“`html

Product Description: Safe Work Method Statement Template for Operating a Lathe Machine

When it comes to operating a lathe machine, ensuring safety and compliance is crucial. Our Safe Work Method Statement (SWMS) Template is designed to make sure all bases are covered. Crafted with diligence and expertise, this template acts as a guide for workers on site while ensuring all necessary precautions are met.

  • Pre-filled and Comprehensive: No need to start from scratch. This template comes pre-filled with essential safety measures tailored to lathe operation. It’s comprehensive yet designed to be a starting point, making the process more efficient for you.
  • Fully Editable and Customisable in Microsoft Word Format: Flexibility is key. You can easily download and edit this document in Microsoft Word. Adjust it as needed to fit the unique requirements of your project and worksite.
  • Includes the Scope of the Project and the Project Details: Clearly define what the job entails right from the word go. This helps in aligning every team member’s understanding of what’s expected during the task.
  • Includes Checklist of Any High Risk Machinery on Site: Have peace of mind knowing you’ve identified and noted down any high-risk equipment on the premises. This ensures everyone is particularly cautious around these machines.
  • Includes Space for Recording Any Staff Training: Documenting staff training is vital. Our template provides ample space to record who’s trained and what training they’ve received, helping to reinforce accountability.
  • Includes Before and After Risk Ratings: Measure risk effectively with clear before and after risk ratings. This allows for assessing how effective your safety measures have been throughout the project’s lifespan.
  • Includes Resources for Use of Legislative References: Stay compliant with relevant workplace laws. This section provides resources helpful in referencing specific legislative prescriptions related to safe lathe operations.
  • Includes All PPE Required: Personal Protective Equipment (PPE) is non-negotiable. The template enumerates all essential PPE items necessary, thereby reducing the margin for error when safeguarding your team members.
  • Includes Risk Assessment and Risk Assessment Matrix: Simplify complex safety assessments using our built-in matrix. This feature assists in identifying, analysing, and mitigating risks efficiently.
  • Includes a Checklist to Ensure All Requirements Have Been Covered When Implementing the SWMS: Cross-check that no stone is left unturned. This checklist serves as a fail-safe mechanism to ensure thoroughness in your safety preparations.
  • Includes Sign Off Page for All Workers and Responsible Persons: Accountability is shared across the board. A sign-off page makes sure everyone from workers to supervisors acknowledges their commitment to safety practices.
  • Easy to Use, Easy to Customise: You don’t have to be a tech guru to use our template. It’s user-friendly design permits quick customisation—it’s literally just a few clicks to adjust to your needs.
  • Suitable for Large Contracts and Tenders, Including Tier 1 Contractual Work: Scale with confidence. Whether it’s a small job or a major contract, this template adapts to suit worksites at any level up to tier 1 contractual obligations.
  • Quick Delivery by Email: Time is critical, and we respect that. Expect prompt email delivery once your order is confirmed, letting you get started straight away.

This template isn’t a one-size-fits-all solution but it’s developed with practicality in mind to assist you in adhering to Australia’s safety standards. We’re here to help facilitate safe operational procedures for your workforce. If questions arise, we’re just an email away.

“`


The Operate A Lathe Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips on oil or debris
    • falling objects
  • 2. Inspection
    • Faulty equipment
    • sharp edges
  • 3. Tool Setup
    • Incorrect tool installation
    • entanglement with moving parts
  • 4. Material Loading
    • Manual handling injuries
    • material slippage
  • 5. Machine Starting
    • Electrical shock
    • sudden machine start-up
  • 6. Lathe Operation
    • Flying debris
    • noise exposure
  • 7. Monitoring Process
    • Eye strain from prolonged monitoring
    • distraction leading to errors
  • 8. Making Adjustments
    • Pinch points
    • accidental contact with hot surfaces
  • 9. Cutting Procedure
    • Tool breakage
    • excessive vibration
  • 10. Changing Tools
    • Hand injuries when removing tools
    • dropping tools
  • 11. Part Removal
    • Cuts from sharp edges
    • back injury during removal
  • 12. Measurement
    • Inaccurate readings due to improper positioning
    • repetitive strain
  • 13. Cleaning Machine
    • Contact with chemicals
    • inhalation of dust
  • 14. Coolant Management
    • Spillage leading to slips
    • contact with skin
  • 15. Maintenance
    • Entanglement in moving parts
    • burns from hot surfaces
  • 16. Troubleshooting
    • Electrical hazards
    • unexpected machine movements
  • 17. Lockout/Tagout
    • Failure to isolate energy sources
    • unauthorised restart
  • 18. Post-Operation Check
    • Overlooking lathe damage
    • residual heat from machine components
  • 19. Documentation
    • Insufficient record-keeping
    • data entry errors
  • 20. Training & Education
    • Lack of operational knowledge
    • insufficient PPE compliance
  • 21. Emergency Response
    • Panic leading to poor decision-making
    • inadequate escape procedure understanding

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Operate A Lathe Machine Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart