Mobile Scaffold Erection Risk Assessment

$79.50

The Mobile Scaffold Erection Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Mobile Scaffold Erection Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The Mobile Scaffold Erection Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect assembly
    • Inadequate Personal Protective Equipment (PPE)
  • 2. Mobile Scaffold Erection
    • Falling from heights
    • Ill maintained equipment
  • 3. Inspection
    • Ineffective safety checks
    • Lack of training
  • 4. Use of Mobile Scaffold
    • Slip and falls
    • Collisions with other workers or machinery
  • 5. Dismantling of Scaffold
    • Fall of materials
    • Equipment malfunction
  • 6. Transport
    • Improper lifting techniques
    • Slips trips and falls
  • 7. Storage
    • Mishandling of equipment
    • Slip and falls due to incorrect storage
  • 8. Maintenance
    • Electrical hazards
    • Exposure to hazardous substances
  • 9. Training
    • Inadequate training methods
    • Miscommunication due to language barriers
  • 10. PPE
    • PPE failure
    • Inappropriate use of PPE
  • 11. Safety Check
    • Overlooked safety checks
    • Inefficient reporting systems
  • 12. Emergency Procedures
    • Lack of properly communicated procedures
    • Inadequate exit routes
  • 13. Regular Inspection
    • Negligence in inspections
    • Missing inspection schedules
  • 14. Reporting
    • Inefficient report system
    • Lack of communication channels
  • 15. Review of WHS Procedures
    • Obsolete Procedures
    • Unawareness of current WHS regulations
Shopping Cart